10. Connect an accurate AC voltmeter and a frequency meter 

across transfer switch terminal lugs E1 and E2. 8kW voltage 

should be 230-240 volts at a frequency of 61-63 Hertz. 14, 

17 and 20kW voltage should be 247-249 at a frequency of 

59.5-60.5 Hertz. 10kW voltage should be 220-230 volts at a 

frequency of 59.5-60.5 Hertz.

11.  Connect the AC voltmeter test leads across terminal lugs E1 

and neutral; then across E2 and neutral. In both cases, volt-

age reading should be 121-126 volts AC (8kW), and 125-126 

volts AC (10, 14, 17 and 20kW).

12.  Set the generator’s main circuit breaker to its OFF (or OPEN) 

position. Let the engine run at no-load for a few minutes to 

stabilize internal engine generator temperatures.

13.  Set the generator's AUTO/OFF/MANUAL switch to OFF. The 

engine should shut down.

NOTE:

It is important not to proceed until certain that gener-

ator AC voltage and frequency are correct and within 

the stated limits. Generally, if both AC frequency and 

voltage are high or low, the engine governor requires 

adjustment* (*GH410 only). If frequency is correct, 

but voltage is high or low, the generator’s voltage 

regulator requires adjustment.

2.3  GENERATOR TESTS UNDER LOAD

To test the generator set with electrical loads applied, proceed as 

follows:
1.  Set generator’s main circuit breaker to its OFF (or OPEN) posi-

tion.

2.  Turn OFF all loads connected to the transfer switch terminals 

T1 and T2.

3.  Set the generator's AUTO/OFF/MANUAL switch to OFF.
4.  Turn OFF the utility power supply to the transfer switch, 

using the means provided (such as a utility main line circuit 

breaker).

  Do not attempt manual transfer switch operation 

until all power voltage supplies to the transfer 

switch have been positively turned off. Failure to 

turn off all power voltage supplies will result in 

extremely hazardous and possibly fatal electri-

cal shock.

5.  Manually set the transfer switch to the STANDBY position, i.e., 

load terminals connected to the generator's E1/E2 terminals. 

The transfer switch operating lever should be down.

6.  Set the generator's AUTO/OFF/MANUAL switch to MANUAL. 

The engine should crank and start immediately.

7.  Let the engine stabilize and warm up for a few minutes.
8.  Set the generator’s main circuit breaker to its ON (or CLOSED) 

position. Loads are now powered by the standby generator.

9.  Turn ON the load center fed by the transfer switch (T1 and 

T2).

10. Connect an accurate AC voltmeter and a frequency meter 

across terminal lugs E1 and E2.

8kW voltage should be greater than 230 volts and frequency 

• 

should be greater than 58 Hz.
10, 

• 

14, 17 and 20kW voltage should be greater than 240 volts 

and frequency should be 60 Hz.

11.  Let the generator run at full rated load for 20-30 minutes. 

Listen for unusual noises, vibration or other indications of 

abnormal operation. Check for oil leaks, evidence of overheat-

ing, etc.

12. When testing under load is complete, turn OFF electrical 

loads.

13.  Set the generator's main circuit breaker to its OFF (or OPEN) 

position.

14.  Let the engine run at no-load for a few minutes.
15.  Set the AUTO/OFF/MANUAL switch to OFF. The engine should 

shut down.

2.4   CHECKING AUTOMATIC OPERATION

To check the system for proper automatic operation, proceed as 

follows:
1.  Set generator’s main circuit breaker to its OFF (or OPEN) posi-

tion.

2.  Check that the AUTO/OFF/MANUAL switch is set to OFF.
3.  Turn OFF the utility power supply to the transfer switch, using 

means provided (such as a utility main line circuit breaker).

4.  Manually set the transfer switch to the UTILITY position, i.e., 

load terminals connected to the utility power source side.

5.  Turn ON the utility power supply to the transfer switch, 

using the means provided (such as a utility main line circuit 

breaker).

6.  Set the generator's main circuit breaker to its ON (or CLOSED) 

position.

7.  Set the AUTO/OFF/MANUAL switch to AUTO. The system is 

now ready for automatic operation.

8.  Turn OFF the utility power supply to the transfer switch.
With the AUTO/OFF/MANUAL switch at AUTO, the engine should 

crank and start when the utility source power is turned OFF after a 

10 second delay. After starting, the transfer switch should connect 

load circuits to the standby side after a 20 to 50 second selectable 

delay. Let the system go through its entire automatic sequence of 

operation.
With the generator running and loads powered by generator AC 

output, turn ON the utility power supply to the transfer switch. The 

following should occur:

After about 10 seconds, the switch should transfer loads back 

• 

to the utility power source.

About one minute after re-transfer, the engine should shut 

• 

down.

• 

Section 2 — Post Installation Start-up and Adjustments

Air-cooled Generators

Summary of Contents for 10kW

Page 1: ...20kW Air cooled Automatic Standby Generators DANGER DEADLY EXHAUST FUMES OUTDOOR INSTALLATION ONLY Not intended for use as Primary Power in place of utility or in life support applications LISTED C US...

Page 2: ...on each indicates follows This symbol points out important safety informa tion that if not followed could endanger per sonal safety and or property of others This symbol points out potential explosion...

Page 3: ...re Initial Startup 14 2 2 Electrical Checks 14 2 3 Generator Tests Under Load 15 2 4 Checking Automatic Operation 15 2 5 Engine Governor Adjustment 16 2 6 Voltage Regulator Adjustment 16 Section 3 Ope...

Page 4: ...able codes and standards Install a battery operated carbon monoxide alarm indoors according to manufacturer s instructions recommendations Adequate unobstructed flow of cooling and ventilating air is...

Page 5: ...ator is installed in accordance with the manufacturer s instructions and recommendations Following proper installa tion do nothing that might alter a safe installation and render the unit in noncompli...

Page 6: ...rred There is also a System Set LED single cylinder or a Status message on the display V twins that displays when all of the conditions described in the System Set LED section are true 1 3 NEC REQUIRE...

Page 7: ...ration of the engine s life This engine is certified to operate on Liquid Propane fuel and pipeline Natural Gas The emission control system on the generator consists of the following Fuel Metering Sys...

Page 8: ...site Base Oil Filter Battery Compartment Fuel Regulator Fuel Inlet back Air Filter Circuit Breakers GFCI Outlet All 17 20kW Control Panel Figure 1 3 14 17 and 20kW V twin GT 990 GT 999 Engine door rem...

Page 9: ...cent for each 1 000 feet above sea level and also will decrease about 1 percent for each 6 C 10 F above 16 C 60 F ambient temperature Load current values shown for 120 volts are maximum TOTAL values f...

Page 10: ...talled verify that the fuel pressure NEVER drops below four 4 inches water column for natural gas or 10 inches water column for liquid propane Prior to installation of the generator the installer shou...

Page 11: ...oor and close the roof 8 Reverse the procedure to convert back to natural gas Figure 1 4 Fuel Selector NOTE Use an approved pipe sealant or joint compound on all threaded fittings to reduce the possib...

Page 12: ...st four 4 feet of clear ance above the generator three 3 feet of clearance on sides and front and 18 inches of clearance at back of unit Install the unit where rain gutter down spouts roof run off lan...

Page 13: ...has been demonstrated that a fire within the enclosure will not ignite combustible materials outside the enclosure Annex A Explanatory Material A4 1 4 2 Means of demonstrating compliance are by means...

Page 14: ...t of the generator should be 36 inches This would include shrubs trees and any kind of vegetation Clearance at the top should be a minimum of 48 inches from any structure overhang or projections from...

Page 15: ...loding A battery presents a risk of electrical shock and high short circuit current The following pre cautions are to be observed when working on batteries Remove the 7 5A fuse from the generator cont...

Page 16: ...o the dipstick FULL mark with the recommended oil Do not fill above the FULL mark 5 Check the fuel supply Gaseous fuel lines must have been properly purged and leak tested in accordance with applicabl...

Page 17: ...o its ON or CLOSED position Loads are now powered by the standby generator 9 Turn ON the load center fed by the transfer switch T1 and T2 10 Connect an accurate AC voltmeter and a frequency meter acro...

Page 18: ...UNITS NOTE All V twin units DO NOT require an engine governor adjustment due to their design 2 5 3 ADDITIONAL CORROSION PROTECTION Periodically spray all engine linkage parts and brackets with corro...

Page 19: ...nerator Control Panel ENTER ECS 3 1 2 SETTING THE EXERCISE TIMER This generator is equipped with an exercise timer Once it is set the generator will start and exercise every seven days on the day of t...

Page 20: ...ys This page can be accessed at any time with several presses of the dedicated Escape key Each press of the Escape key takes you back to the previous menu until the main menu is reached This page disp...

Page 21: ...seconds Will transfer back when utility returns for 10 consecutive seconds The engine will continue to run until removed from the Manual mode 2 Auto Will start and run if Utility fails for 10 consecut...

Page 22: ...ystem to automatic operation as outlined in Automatic Transfer Operation section 3 5 SIDE COMPARTMENT V TWIN ONLY FIGURES 3 4 3 5 Local codes may require this compartment to be locked A hasp is provid...

Page 23: ...Temperature Switches Oil Filter Oil Drain Hose Low Oil Switch HighTemp Switch Loosen NOTE The oil drain hose may be routed in the opposite direction as shown in figure Over Speed Shutdown Alarm 4320...

Page 24: ...The maintenance counters will be adjusted to the new time and date NOTE Since most maintenance alerts will occur at the same time most have two 2 year intervals only one will appear on the display at...

Page 25: ...ngine by moving the AUTO OFF MANUAL switch to MANUAL and run until it is thoroughly warmed up Then shut OFF the engine by moving the switch to the OFF position 2 Immediately after the engine shuts OFF...

Page 26: ...e location of the air cleaner Use the following procedure Figure 4 6 1 Lift the roof and remove the door 2 Turn the worm gear clamp screw counterclockwise to loos en 3 Pull the old filter off the divi...

Page 27: ...ctrolyte has been known to be harmful to the skin and eyes and to be toxic The electrolyte is a dilute sulfuric acid that is harmful to the skin and eyes It is electrically conductive and corrosive Th...

Page 28: ...n wrench and tighten the rocker arm jam nut Tighten the jam nut to 174 in lbs torque After tightening the jam nut recheck valve clearance to make sure it did not change Install new valve cover gasket...

Page 29: ...2 Check the tag on the engine for oil viscosity and classification Verify that the correct recommended oil is used in the engine see the Engine Oil Recommendations section If necessary drain and refi...

Page 30: ...ING Enclosure louvers X X W BATTERY Remove corrosion ensure dryness X X M Clean and tighten battery terminals X X M Check charge state X R EVERY 6 M Electrolyte level X R EVERY 6 M ENGINE AND MOUNTING...

Page 31: ...2 Clean re gap or replace plug s 3 Fuel pressure incorrect 3 Confirm fuel pressure to regulator is 10 12 water column 0 36 0 43 psi for LP and 5 7 water column 0 18 0 25 psi for natural gas 4 Fuel sel...

Page 32: ...to select the the desired screen refer to the Menu System diagram 6 1 1 CHANGING SETTINGS EDIT MENU To change a setting such as display contrast go to the EDIT menu and use the keys to navigate to the...

Page 33: ...or Other 60 Hz The possible Status messages of the display are as follows Switched Off Time Date Ready to Run Time Date Utility Loss Delay Pausing for X Seconds Cranking Attempt X Running in Exercise...

Page 34: ...RAL GROUND POWER LEADS AND TRANSFER SWITCH LEADS MUST BE RUN IN TWO DIFFERENT CONDUITS EXCEPTIONS IF THE INSULATION RATING ON ALL WIRING IS RATED FOR 600V AND THE LENGTH OF THE CONDUIT IS 30 ft OR LES...

Page 35: ...NEUTRAL GROUND UTILITY METER SOCKET POWER LEADS AND TRANSFER SWITCH LEADS MUST BE RUN IN TWO DIFFERENT CONDUITS EXCEPTIONS IF THE INSULATION RATING ON ALL WIRING IS RATED FOR 600V AND THE LENGTH OF T...

Page 36: ...34 Section 7 Installation Diagrams Air cooled Generators Generator Drawing No 0G8280 D...

Page 37: ...35 Section 7 Installation Diagrams Air cooled Generators Generator Drawing No 0G8280 D...

Page 38: ...e neglect improper maintenance or unapproved modifications or the use of counterfeit and or grey market parts not made supplied or approved by Generac You are responsible for contacting a Generac Auth...

Page 39: ...section 4 below Any such emissions related part repaired or replaced under the ECS Warranty shall be warranted for the remainder of the ECS Warranty Period prior to the first scheduled replacement poi...

Page 40: ...Part No 0H4762 Revision A 07 28 09 Printed in U S A...

Reviews: