Figure 10 - Gas Piping
9.3 Leak Check Gas Piping
After making gas connections, open manual shutoff
valve(s) and check all gas connections for leaks before
placing boiler in operation.
Locate leakage using gas detector, noncorrosive detection
fl uid, or other leak detection method acceptable to
authority having jurisdiction. Do not use matches, candles,
open fl ames, or other methods providing ignition source.
Correct leaks immediately and retest.
9 - GAS SUPPLY PIPING
DANGER
Fire Hazard. Do not use matches, candles, open
fl ames, or other methods providing ignition source.
Failure to comply will result in death or serious
injury.
!
18
Summary of Contents for Olsen OQ95M-200
Page 2: ...1 DIMENSIONS OPENING FOR SAFETY RELIEF VALVE DISCHARGE PIPE 30 785mm 39 1 1m 18 458mm 2 ...
Page 27: ...APPENDIX A BOILER PIPING AND WIRING Electrical Wiring Diagram 27 ...
Page 49: ...49 NOTES ...
Page 50: ...50 NOTES ...
Page 51: ...51 Company Address Phone Company Name Tech Initials Service Performed Date SERVICE RECORD ...
Page 52: ...ECR International 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com ...