32
11 - GENERAL MAINTENANCE AND CLEANING
11.1
Beginning of Each Heating Season
• Check boiler area is free from combustible materials,
gasoline, and other
fl
ammable vapors and liquids.
• Visually inspect combustion air and vent piping for
proper operation. Check for and remove any obstruction
to
fl
ow of combustion air or vent gases. Immediately
repair or replace pipe showing deterioration or leakage.
Reassemble per instructions in section 6. Ensure proper
reassembly and resealing of system.
• Test safety relief valve for proper operation. Refer to
valve manufacturer's instructions packaged with relief
valve.
• Examine
fl
ue passages in heat exchanger, burner and
cleaning (if necessary) by following instructions in
“Annual Inspection and Cleaning of Boiler Components” in
this section.
• Circulator pump and combustion air blower motor
furnished with boiler are permanently lubricated from
factory and require no further lubrication. Lubricate
fi
eld
sourced pumps and/or motors according to pump and/or
motor manufacturer’s instruction.
• Check following components are operating properly and
are free of blockages or obstructions:
• air vent;
• check air inlet for blockage and clean as required;
• check boiler for any sign of leaks.
• Check heating system expansion tank.
• Check the Air pressure tubing
11.2
Annual Shut Down Procedure
• Follow instructions “To Turn Off Gas To Appliance” unless
boiler is also used to supply domestic hot water. See
section 10, page 26.
• Drain system completely if system does not have
antifreeze when heating system is to remain out of
service during freezing weather.
WARNING
Following service procedures must be performed
by quali
fi
ed service agent. Boiler owner shall not
attempt these steps. Failure to do so could result in
death or serious injury.
!
11.3
Annual Inspection and Cleaning of Boiler
Components
• Burner and heat exchanger inspection and cleaning.
• Remove any remaining loosened sediment using shop
vacuum with snorkel attachment.
Summary of Contents for CHB-100
Page 6: ...Figure 2 Component Listing 6 3 GENERAL VIEW AND MAIN COMPONENTS ...
Page 33: ...33 12 RATINGS AND CAPACITIES ...
Page 38: ...KEY Part Number Description Qty A01 FE3980B830 CASING CTR 1 38 REPAIR PARTS LIST CHB 100 ...
Page 40: ...40 REPAIR PARTS LIST CHB 100 ...
Page 42: ...42 REPAIR PARTS LIST CHB 100 ...
Page 44: ...KEY Part Number Description Qty A01 FE3980B830 CASING CTR 1 44 REPAIR PARTS LIST CHB 130 ...
Page 46: ...46 REPAIR PARTS LIST CHB 130 ...
Page 48: ...48 REPAIR PARTS LIST CHB 130 ...
Page 50: ...NOTES 50 ...
Page 51: ...NOTES 51 ...
Page 52: ...ECR International Inc 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com ...