5
EIHPTC
CEILING FLOOR TYPE
• Do keep the ceiling flat. Consolidate the roof beam to avoid
possible vibration.
• Cut off the roof beam.
• Strengthen the place that has been cut off, and consolidate
the roof beam.
After the selection of installation location, position the
refrigerant pipes, drain pipes,indoor & outdoor wires to the
connection places before hanging up the machine.
The installation of hanging screw bolts.
WOODEN CONSTRUCTION
Put the square timber traversely overthe roof beam, then install
the hanging screw bolts.
NEW CONCRETE BRICKS
Inlaying or embedding the screw bolts.
FOR ORIGINAL CONCRETE BRICKS
Install the hanging hook with expansible bolt into the concrete
deep to 45~50mm to prevent loose.
STEEL ROOF BEAM STRUCTRUE
Install and use directly the supporting angle steel.
Fig.5-3
Roof beam
Hanging screw bolts
Ceiling
Timber over the beam
Fig.5-4
Fig.5-5
Steel bar
Embedding screw bolt
(Pipe hanging and embedding screw bolt)
(Blade shape
insertion)
(Slide insertion)
Fig.5-6
Fig.5-7
Hanging screw bolt
Hanging
bolts
Supporting
angle steel
Fig.5-8
Side board
Grille
Hanging arm
Hanging
screw bolt
Screw nut
Washer
Hanging
screw bolt
Hanging arm
Fig.5-9
20
25mm
20mm
Fig. 5-10
D. Connecting point of refrigerant pipe
(D.gas side)
Drain point
Downward declicity lower between(1-2)/100
E. Connecting point of refrigerant pipe
(E. Liquid side)
Fig. 5-11
Fig. 5-12
2
3
Install the indoor unit.
Remove the side board and the grille. (Refer to Fig. 5-8)
Locate the hanging arm on the hanging screw bolt.
(Refer to Fig. 5-9)
Ceiling Installation
Wall Mounting Installation
4