INSTALLATION, OPERATION AND MAINTENANCE MANUAL
Pellet boiler Bisolid OM-PBBV02/07/2017/EN
27
5.4.2.
CONNECTING TO THE HEATING INSTALLATION
As next the hot water pellet boiler from series Bisolid must be connected to the heating
installation by using proper fittings – has to be performed according to the preliminary
prepared technical project.
5.4.3.
INSTALLATION OF PELLET BURNER FROM SERIES BISOLID GP XX_B HC>
When installing the pellet burner with manually cleaning from series Bisolid GP
xx_B hc> is it necessary to compiling the requirements set out in its manual. It
also needs to use the seal of mineral wool, which are carefully placed on the
coupling flange of the burner and used for insulation and reduce heat flow,
which is transmitted by the boiler to the burner.
Figure 5.2. View of the mounting flange for connecting the pellet burner to the hot water
boiler.
After mounting of the burner the screws have to be tightened equally, so the sealing between
its flange and the boiler body is guaranteed.
Mounting screws for
pellet burner from series
Bisolid GP xx_B hc> to
the boiler
Side opening for
mounting of the pellet
burner