INSTALLATION, OPERATION AND MAINTENANCE MANUAL 

 

Pellet boiler Bisolid                                                                            OM-PBBV02/07/2017/EN

 

 

24 

 

5. 

MOUNTING AND INSTALLATION OF PELLET BOILER BISOLID 

 

5.1. 

REQUIREMENTS FOR INSTALLATION OF PELLET BOILER BISOLID

 

 
When  installing  the  hot  water  pellet  boiler  from  series  Bisolid  is  necessary  to  meet  the 
following basic requirements: 

  The  room  anticipated  to  install  the  boiler  must  provide  a  constant  flow  of  fresh  air 

needed for combustion and good ventilation. 

  It is not allowed installation of the boiler in dwellings, including corridors. 
  Connecting  the  hot  water  pellet  boiler  from  series  Bisolid  to  the  heating  installation 

must be performed only by authorized qualified technician. 

  Installation and maintenance of equipment with solid fuel is carried out by specialized 

companies with the right to conduct such activities. 

  The hot water pellet boiler from series Bisolid is connected to the heating system with 

CLOSED  expansion  vessel.  In  the  event  that  the  system  is  with  closed  expansion 
vessel,  in  it  must  be  installed  pressure  valve  that  opens  when  exceeding  the 
operating  pressure  of  the  boiler  (0.25  MPa)  and  this  valve  must  be  certified  in 
accordance with PED 97/23. 

  Before the commissioning of the boiler there should be ensured complete filling with 

water/liquid circulation and venting of the heating system. 

  Maintenance  of  the  boiler  should  be  performed  only  by  adults  who  are  familiar  with 

the instructions for use of the equipment. 

 
The  achieved  heating  output  of  the  system:  hot  water  pellet  boiler  from  series  Bisolid  and 
automated  pellet  burner  with  manually  cleaning  from  series  Bisolid  GP  xx_B  hc>  depends 
on: 

  The heating output adjusted for the burner operation. 
  The contamination level of the boiler’s heat exchanging surfaces. 
  The  sealing  level  of  the  door  and  combustion  chamber’s  covers  (the  sealing  ropes 

condition). 

  The chimney draught. 

 

The  efficiency  coefficient  of  the  system:  hot  water  pellet  boiler  from  series  Bisolid  and 
automated pellet burner with manually cleaning from series Bisolid GP xx_B hc> in nominal 
operation  mode  reaches  89%  (depending  on  the  specific  system)  –  it  can  be  achieved  by 
adjustment of the burner’s operation parameters by the use of gas-analyzer (to be performed 
by an authorized servicing specialist). 
 
 

5.2. 

REQUIREMENTS FOR INSTALLATION OF PELLET BURNER BISOLID GP XX_B 
HC> TO BOILER BISOLID

 

 

The automated pellet burner with manually cleaning from series Bisolid GP xx_B hc> has to 
be mounted to the heat exchanger unit of the hot water pellet boiler from series Bisolid. The 
boiler  construction  provides  availability  for  “left”  or  “right”  mounting  of  the  burner,  therefore 
the suitable combination should be chosen during the preliminary system installation project. 
During  the  mounting  process  a  proper  sealing  between  the  modules/components  must  be 
ensured in order to prevent intake of unorganized air from the environment or exhaust of flue 
gasses. The following requirements must be also taken into account:  

  Easy access for cleaning of the burner’s fire-grate. 
  Secured safe operation conditions and maintenance of the system reliability. 
  Availability  for  adjustment  and  servicing  of  the  system:  heat  exchanger  of  the  pellet 

boiler from series Bisolid (for example when necessary to clean it), burner from series 
Bisolid  GP  xx_B  hc>  -  for  adjustment,  necessity  for  maintenance  and  regulation, 

Summary of Contents for Bisolid 18

Page 1: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL Pellet boiler Bisolid 20 July 2017 OM PBBV02 07 2017 EN MANUAL FOR INSTALLATION OPERATION AND MAINTENANCE OF PELLET BOILER OF SERIES BISOLID...

Page 2: ...4 8 MOUNTING OF THE COVER OVER THE BOILER S CONVECTION TRACT 31 5 4 9 MOUNTING OF THE COVER OVER THE BOILER S COMBUSTION CHAMBER 32 5 4 10 CONNECTING THE PELLET BURNER TO THE BOILER 32 5 4 11 MOUNTING...

Page 3: ...hniques Your pellet boiler and all of its accessories operate under variable electricity 230 VAC Improper electrical installation or repair may endanger user s life from electrical shock Installation...

Page 4: ...et boiler After unpacking the pellet boiler please check its completeness and delivered elements Check whether the pellet boiler size corresponds to the desired designation If any failures or troubles...

Page 5: ...lly cleaning from series Bisolid GP xx_B hc 1kit Ash container tray 1pc Boiler s bottom cover panel between the second and third pass Fire clay made bricks 2 pcs Flap 1pc Door handle 1pc Cleaning kit...

Page 6: ...the chimney condition and on the flue gas temperature The hot water boiler s Bisolid heat exchanger construction complies with the resistance requirements for such type of appliances EN 303 5 2012 He...

Page 7: ...es Bisolid GP xx_B includes Main module 1pc Fuel transport auger 1 pc Flexible pipe 1 pc with brackets 2 pcs Manual for installation maintenance and operation of pellet burner from series Bisolid GP x...

Page 8: ...y of the appliance at minimum fuel consumption Automatic modulation of the burning process decreasing the number of stops and ignitions respectively fuel and electricity consumption Manually mechanica...

Page 9: ...stem and optimal conditions for operation of the burner s transport auger In case the hopper is build constructed at the customer s site then its construction must provide free gravity fuel flow to th...

Page 10: ...ERATION AND MAINTENANCE MANUAL Pellet boiler Bisolid OM PBBV02 07 2017 EN 10 Figure 3 4 Sectional assembled sheet metal pellets hopper with 250kg capacity Figure 3 5 Sheet metal pellets hopper with ca...

Page 11: ...ge kW 7 5 18 7 5 25 9 30 Used fuel Wood pellets Suitable wood pellets class according to standard EN ISO 17225 2 2014 A1 Required air quantity to achieve effective burning process kg h 27 30 45 50 57...

Page 12: ...t overpressure bar 4 Recommended operation water temperature in the boiler C 80 Minimum boiler inlet water temperature C 60 Chimney draught Pa 12 15 Connection pipes Inlet outlet water G 1 Flue outlet...

Page 13: ...n boiler no Fuel Preferred fuel only one Other suitable fuel s Log wood moisture content 25 no no Chipped wood moisture content 15 35 no no Chipped wood moisture content 35 no no Compressed wood in th...

Page 14: ...For solid fuel cogeneration boilers Electrical efficiency Auxiliary electricity consumption At rated heat output el n At rated heat output elmax 0 156 kW At 30 50 of rated heat output if applicable e...

Page 15: ...e content 25 no no Chipped wood moisture content 15 35 no no Chipped wood moisture content 35 no no Compressed wood in the form of pellets or briquettes yes no Sawdust moisture content 50 no no Other...

Page 16: ...l cogeneration boilers Electrical efficiency Auxiliary electricity consumption At rated heat output el n At rated heat output elmax 0 156 kW At 30 50 of rated heat output if applicable elmin 0 134 kW...

Page 17: ...e content 25 no no Chipped wood moisture content 15 35 no no Chipped wood moisture content 35 no no Compressed wood in the form of pellets or briquettes yes no Sawdust moisture content 50 no no Other...

Page 18: ...ed heat output el n At rated heat output elmax 0 156 kW At 30 50 of rated heat output if applicable elmin 0 134 kW Of incorporated secondary emission abatement equipment if applicable In standby mode...

Page 19: ...1 6 1 8 1 Moisture 10 10 10 Ash A dry 0 7 1 2 2 0 Buck density BD kg m3 600 600 600 Mechanical durability DU 97 5 97 5 96 5 Net caloricity Q MJ kg kWh kg 16 5 4 6 16 5 4 6 16 5 4 6 Chlorine Cl 0 02 0...

Page 20: ...PBBV02 07 2017 EN 20 The hot water pellet boiler from series Bisolid overall dimensions are presented on the next figures Figure 4 1 View of hot water pellet boiler from series Bisolid overall sizes f...

Page 21: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL Pellet boiler Bisolid OM PBBV02 07 2017 EN 21 Figure 4 3 View of hot water pellet boiler from series Bisolid overall and connection sizes rear side view...

Page 22: ...et boiler Bisolid OM PBBV02 07 2017 EN 22 Figure 4 4 View of pellet boiler Bisolid Boiler s convection tracts cover Boiler s combustion chamber cover Boiler s combustion chamber door cover panel Pelle...

Page 23: ...of the flue gasses and main construction modules Ash container tray Combustion chamber door of the boiler Combustion chamber of the boiler Flue gas first pass of the boiler Flue gas second pass of the...

Page 24: ...anually cleaning from series Bisolid GP xx_B hc depends on The heating output adjusted for the burner operation The contamination level of the boiler s heat exchanging surfaces The sealing level of th...

Page 25: ...ies Bisolid GP xx_B hc main module is mounted and a wall must be at least 500 mm in order to ensure free access to the burner itself as the fuel transport auger and hopper position has to be also take...

Page 26: ...boiler from series Bisolid has been positioned it must be connected to the heating installation and to the chimney by observing the relevant requirements For correct and reliable operation it is requ...

Page 27: ...from series Bisolid GP xx_B hc is it necessary to compiling the requirements set out in its manual It also needs to use the seal of mineral wool which are carefully placed on the coupling flange of t...

Page 28: ...4 MOUNTING THE FIRE CLAY MADE DIRECTING BRICKS The fire clay bricks delivered with the boiler kit should be mounted in the heat exchanger s combustion chamber during transportation of the system the b...

Page 29: ...OF THE COVER PLATE IN FRONT OF THE FLUE GAS OUTLET The cover panel has to be positioned by placing it on the special welded supports on the one side and in contact with the boiler body wall on the ot...

Page 30: ...lue outlet can be clearly seen Figure 5 7 Directing cover panel correct positioning The directing cover panel is placed over the boiler s side before its correct positioning The directing cover panel...

Page 31: ...OF THE BOILER S HORIZONTAL COVERS Figure 5 8 Covers positioning of hot water pellet boiler from series Bisolid 5 4 8 MOUNTING OF THE COVER OVER THE BOILER S CONVECTION TRACT This cover is equipped wi...

Page 32: ...directing cover over the boiler s combustion chamber are different and their positions must not be changed 5 4 10 CONNECTING THE PELLET BURNER TO THE BOILER On the rear side of the boiler s side cove...

Page 33: ...manometer is positioned at the top left corner of the heat exchanger s front panel 5 4 11 MOUNTING OF THE FUEL TRANSPORT AUGER TO THE BURNER The fuel transport auger has to be mounted in accordance t...

Page 34: ...serves its right to make changes over the system s construction without obligation to inform its customers 5 4 13 CONNECTING OF THE BOILER TO THE MAIN POWER SUPPLY The power supplying of the system co...

Page 35: ...HW boiler 4 Check valve 5 Circulation pump 1 6 Relief valve 7 Opened or closed expansion vessel 8 Ball valve 9 Three way mixing valve 10 Circulation pump 2 The completion of the installation and imple...

Page 36: ...cleaning from series Bisolid GP xx_B hc and storage of the fuel It is recommended to place a fire extinguisher at easy accessible and visible place The heating systems with opened expansion tank allow...

Page 37: ...f the system operation parameters More information is presented in the pellet burner from series Bisolid GP xx_B hc manual book Components of the interface control panel and their functions see Figure...

Page 38: ...to check the door proper closing its sealing the covers and also the chimney condition The same situation may occur during transition seasons autumn and spring when the natural chimney draught is low...

Page 39: ...justment of the automated pellet burner operation are presented in its manual book these parameters must be changed only by trained servicing technician The heating output adjustment of the system hot...

Page 40: ...that the used wood pellets type has to be changed for example the change of class of pellets it might be necessary to change the burner s heating output level 6 4 DECREASING THE BOILER HEATING OUTPUT...

Page 41: ...reases the appliance life At the end of the heating season not only cleaning but also prophylaxis has to be performed by specialized servicing company Observance of these procedures ensures long life...

Page 42: ...oling of the boiler and burner to safe temperatures of their surfaces should open the door of the combustion chamber to remove the grate to clean the ash and grate back them into place and then close...

Page 43: ...orking conditions from once a week to once a day The number and frequency of cleaning of the pellet burner depend largely on the quality of the used wood pellets The fuel is necessary to meet the requ...

Page 44: ...on and operation requirements during initialization and maintenance are observed The warranty period of the system modules hot water boiler from series Bisolid and automated pellet burner from series...

Page 45: ...ning from series Bisolid GP xx_B hc has its own warranty card and it is necessary also to be completed 6 11 ACTIONS AFTER EXPIRY OF THE BOILER LIFE CYCLE After expiry of the boiler s modules life cycl...

Page 46: ...rature thermostat It is necessary to decrease the assigned value of the circulations water temperature the recommended minimum value is 60 o C High heating output level of the burner It is necessary t...

Page 47: ...pecialist Presence of incompletely burned fuel in the boiler s ash tray Inefficient fuel combustion It is necessary to adjust the burner s operation parameters performed by specialist High flue gas te...

Page 48: ...ther not presented failures Ask for servicing assistance In case the chimney s operation parameter values are bellow the required minimum prescribed for reliable operation of the hot water pellet boil...

Page 49: ...l voltage Figure 8 2 presents the wiring diagram for electrical connection of pellet burner with manually cleaning from series Bisolid GP xx_B hc to panel with connectors located at the rear of the ho...

Page 50: ...AND MAINTENANCE MANUAL Pellet boiler Bisolid OM PBBV02 07 2017 EN 50 Figure 8 1 Principal wiring diagram of the control board of pellet boiler from series Bisolid operating with pellet burner from ser...

Page 51: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL Pellet boiler Bisolid 20 July 2017 OM PBBV02 07 2017 EN Figure 8 2 Wiring diagram of the panel with connectors for connecting of the pellet burner...

Page 52: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL Pellet boiler Bisolid OM PBBV02 07 2017 EN 52 Supplier Address City Street Tel Fax http Reserved rights for technical changes...

Reviews: