INSTRUCTIONS MANUAL
-55-
The nitrogen will be injected into the A/C system, the test will start as soon as the pressure is
stable:
If leaks are detected, the machine will give an alarm signal, discharge the nitrogen from the
system, and display a SYSTEM LEAKS alarm warning. If the test detects no leaks, the
machine will discharge the nitrogen:
Close external bottle and press
to continue
then the machine will sound and alarm and the following screen will be displayed:
Disconnect coupling, then press
the following screen will be displayed:
N2 test in progress
DD/MM/YY XX:XX PM
MANUAL / / NITROGEN TEST (N2)
N2 pressure
9.7 bar
05:41
Close external bottle and press to continue
DD/MM/YY XX:XX PM
MANUAL / / NITROGEN TEST (N2)
N2 discharge
DD/MM/YY XX:XX PM
MANUAL / / NITROGEN TEST (N2)
Disconnect N2 bottle and press to continue
DD/MM/YY XX:XX PM
MANUAL / / NITROGEN TEST (N2)
Summary of Contents for ECK FLAG
Page 1: ......
Page 23: ...INSTRUCTIONS MANUAL 24 FIG 8 p 9 g 8 FIG 9 s v u i w t...
Page 24: ...INSTRUCTIONS MANUAL 25 l FIG 10 k c d e 1 b f j v q r x...
Page 25: ...INSTRUCTIONS MANUAL 26 FIG 11 n o 2 m a y z...
Page 26: ...INSTRUCTIONS MANUAL 27 FIG 12 4 3 6 5 h 7...
Page 101: ...INSTRUCTIONS MANUAL 102 CODES SUMMARY OPTION code 43210791...
Page 102: ...MANUEL D INSTRUCTIONS 2...