12
–
remove spent cartridge from the bowl, place a clean one inside
and screw the bowl back on.
Do not torque over 2
kgf×m
when tightening bowl.
5.10
To replace membrane element proceed as follows:
–
remove the power from the unit;
–
shut off water supply and relieve pressure;
–
disconnect feed, permeate, and concentrate tube connections
at membrane module outlets;
–
remove caps from the pressure vessel;
–
push the membrane element from the feed end towards the
discharge end (in the direction of the arrow). Extract the membrane
element by pulling it at the discharge end of the vessel;
–
install new membrane element, observing flow direction as
indicated by the arrow;
–
fasten the caps and re-connect tubes back to the vessel.
Do not perform any maintenance, repair, cleaning, moving
the unit or ancillary units (permeate tank, media filters etc),
when the unit is connected to power and water supply.
Do not subject pressure vessel to mechanical impact
(shocks, static load etc).
The manufacturer shall not be held liable for any damages
incurred by the owner of the unit or any third party due to
failure to adhere to the safety precautions or installation
guidelines herein.