Econex MPV Series Installation And Maintenance Manual Download Page 6

 

6 of 11 

 

5.2

 

W

ITH MANUAL

/

AUTOMATIC CONTROL STATION

 

 
 
             
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Terminal 

   earthing 

Terminal  1   N = neutral 
Terminal  2 

by tension the valve closes  

Terminal  3   by tension the valve opens 
Terminal  4 

for manual electric control 

Terminal 16  answer signal when the valve reaches the “open” position  
Terminal 17  answer signal when the valve reaches the “closed” position 

 

 
 

6.3 Auxiliary 

microswitches 

 

Terminal 20  common contact from the auxiliary microswitch S3 
Terminal 21  normally open contact of the auxiliary microswitch S3 
Terminal 22  normally closed contact of the auxiliary microswitch S3  
Terminal 23  common contact from the auxiliary microswitch S4 
Terminal 24  normally open contact of the auxiliary microswitch S4 
Terminal 25  normally closed contact of the auxiliary microswitch S4 

 
 

6.4 

Potentiometer/s for answer signal of the position Pot. A 

and

/

or

 Pot. B 

 

Terminal 30  max. value 
Terminal 31  cursor  
Terminal 32  min. value 
Terminal 33  max. value 
Terminal 34  cursor  
Terminal 35  min. value 

Summary of Contents for MPV Series

Page 1: ...IC CONNECTIONS 4 5 WIRING 5 5 1 WITHOUT MANUAL AUTOMATIC CONTROL STATION 5 5 2 WITH MANUAL AUTOMATIC CONTROL STATION 6 6 AUXILIARY MICROSWITCHES 7 7 POTENTIOMETER S 7 8 CONTROL STATION 7 9 CALIBRATION...

Page 2: ...g conditions interchangeable without removing he valve from the plant WARNING Installation wiring adjustment and maintenance of gear motors must be carried out exclusively by skilled and authorized se...

Page 3: ...ions 3 5 Remove the protection plugs installed on the valve body 3 6 The sealant must be applied only on the piping outer threading and not on the valve inner threading Use gas suitable sealants only...

Page 4: ...es must comply with local prescriptions and in any case their section must be ranging between 1 and 1 5 mm2 Connection piping recommended H07V U G1 5 mm2 4 6 Wiring diagrams are reported in the attach...

Page 5: ...ATION TERMINAL BOARD Terminal earthing Terminal N1 N neutral Terminal L2 by tension the valve closes Terminal 3 by tension the valve opens Terminal 4 for manual electric operation Terminal 16 answer s...

Page 6: ...0 common contact from the auxiliary microswitch S3 Terminal 21 normally open contact of the auxiliary microswitch S3 Terminal 22 normally closed contact of the auxiliary microswitch S3 Terminal 23 com...

Page 7: ...e does not correspond to the wished one proceed as indicated in paragraph 9 2 of chapter 9 CALIBRATIONS Absorbed power is 2 W for each potentiometer 8 CONTROL STATION 8 1 The control station enables t...

Page 8: ...rst the lever on its curved side to move the blue cam to a more suitable position to perform adjustment picture 1 Picture 1 9 1 6 To calibrate refer to the mechanical position indicator disc the valve...

Page 9: ...een terminals n 34 and 35 when the valve is closed picture 2 Picture 2 9 2 4 By rotating the potentiometer clockwise 3 the resistance value increases counter dock wise 4 the resistance value decreases...

Page 10: ...echanically 9 3 7 Select the AUTO position 9 3 8 Set the adjustment device on 6 mA or on 2 Vdc and wait up the servocontrol moves then take it back to 4 mA or on 0 Vdc and check it reaches 0 degrees 9...

Page 11: ...cock can be opened and the operating test can be carried out 11 MAINTENANCE AND CHECKS 11 1 The MPV valve does not require any special maintenance Both the valve body and the actuator do not need any...

Reviews: