Econex MPV Series Installation And Maintenance Manual Download Page 2

 

2 of 11 

 

 

1.

 

MAIN FEATURES  

 

 

The modulating valves in the MPV [Modulating Plug Valve] series have been designed 
with a modern concept and they are DVGW approved, with CE identification number. 
They are suitable to be used in commercial and industrial combustion systems. 
They are especially suitable for the proportional adjustment of non corrosive fuel gases 
from the first, second and third family and air. The MPV valve is an adjustment device 
without zero closing. The actuator is equipped with a single-pole bi-directional motor 
with high static torque and holding torque for 3-positional control or electronic 
modulation with analogic signal current [4 ÷ 20 mA] or tension [0 ÷ 10 Vdc] variation 
at. The adjustment of flow volume in the valve operates by a delivery adjusting 
cylinder with linear characteristics. The cylinder rotation changes the passage opening 
and the flow volume is adjusted according to a linear trend.  
Three different orifice sizes are available according to the operating conditions, 
interchangeable without removing he valve from the plant. 

 

 

 

WARNING 

Installation, wiring, adjustment and maintenance of gear motors must be carried out 
exclusively by skilled and authorized service technicians. Non-proper installation, 
adjustment, modifications, use and maintenance may cause injuries to the staff or 
material damages. It is therefore necessary to respect strictly the following 
instructions and local prescriptions for the installation of electric and gas devices. 

 
 

2.

 

TECHNICAL FEATURES 

 

Operating pressure 

max. 500 mbar 

Valve group 

Ambient temperature  

from -10 to +60°C 

Adjusting ratio 

25:1 

Fittings 

Rp 1, according to ISO 7-1 

Delivery feature 

linear 

Valve 

without zero closing 

Available voltage 

230 Vac / 50 - 60 Hz 

 

 

115 Vac / 50 - 60 Hz 

 

 

24 Vac / 50 - 60 Hz 

Nominal load 

7 VA 

Electric protection 

IP 54 according to EN60529 

Duty cycle 

:   continuous 100% 

Cable fasteners 

2 x Pg 13.5 

Opening/closing times 

30 ÷ 60 seconds at 50 Hz 

Limit - Aux. switches rating 

:     5 [1] A  250 Vac 

Available potentiometers 

:   150, 1000 [standard], 2500 ohm 

Control signal 

4 ÷ 20 mA [only with supply voltage 24 Vac] 

                       

[for electronic version]

 : 

0 ÷ 10 Vdc [only with supply voltage 24 Vac] 

Accessories : 

adjustable 

manual 

by-pass 

 

Summary of Contents for MPV Series

Page 1: ...IC CONNECTIONS 4 5 WIRING 5 5 1 WITHOUT MANUAL AUTOMATIC CONTROL STATION 5 5 2 WITH MANUAL AUTOMATIC CONTROL STATION 6 6 AUXILIARY MICROSWITCHES 7 7 POTENTIOMETER S 7 8 CONTROL STATION 7 9 CALIBRATION...

Page 2: ...g conditions interchangeable without removing he valve from the plant WARNING Installation wiring adjustment and maintenance of gear motors must be carried out exclusively by skilled and authorized se...

Page 3: ...ions 3 5 Remove the protection plugs installed on the valve body 3 6 The sealant must be applied only on the piping outer threading and not on the valve inner threading Use gas suitable sealants only...

Page 4: ...es must comply with local prescriptions and in any case their section must be ranging between 1 and 1 5 mm2 Connection piping recommended H07V U G1 5 mm2 4 6 Wiring diagrams are reported in the attach...

Page 5: ...ATION TERMINAL BOARD Terminal earthing Terminal N1 N neutral Terminal L2 by tension the valve closes Terminal 3 by tension the valve opens Terminal 4 for manual electric operation Terminal 16 answer s...

Page 6: ...0 common contact from the auxiliary microswitch S3 Terminal 21 normally open contact of the auxiliary microswitch S3 Terminal 22 normally closed contact of the auxiliary microswitch S3 Terminal 23 com...

Page 7: ...e does not correspond to the wished one proceed as indicated in paragraph 9 2 of chapter 9 CALIBRATIONS Absorbed power is 2 W for each potentiometer 8 CONTROL STATION 8 1 The control station enables t...

Page 8: ...rst the lever on its curved side to move the blue cam to a more suitable position to perform adjustment picture 1 Picture 1 9 1 6 To calibrate refer to the mechanical position indicator disc the valve...

Page 9: ...een terminals n 34 and 35 when the valve is closed picture 2 Picture 2 9 2 4 By rotating the potentiometer clockwise 3 the resistance value increases counter dock wise 4 the resistance value decreases...

Page 10: ...echanically 9 3 7 Select the AUTO position 9 3 8 Set the adjustment device on 6 mA or on 2 Vdc and wait up the servocontrol moves then take it back to 4 mA or on 0 Vdc and check it reaches 0 degrees 9...

Page 11: ...cock can be opened and the operating test can be carried out 11 MAINTENANCE AND CHECKS 11 1 The MPV valve does not require any special maintenance Both the valve body and the actuator do not need any...

Reviews: