-14-
f) Follow the requirements of applicable local and national electrical codes.
g) These modules contain factory installed bypass diode .if these modules are incorrectly
connected to each other, the bypass diodes, cable or junction box may be damaged.
h) The module shall wire in accordance with the NEC, the grounding method of the frame of
arrays shall comply with the NEC, article 250
i) It is recommended that the screw be tightened to a torque of 2.3 and 2.8NM
j) The cable of the junction box is defined as L1, as showed below. For Econess Energy
standard module, L1 is 900 mm; and for customized module, L1 can be 1000mm. Please
base on your condition, take the cable length into consideration before designing the
wiring layout.