background image

01

https://www.altonindustries.com

02

[email protected]

Fig.1

3

11

9

4

7

6

5

1

3

3

9

1

9

10

3

4

10

FEATURES

5

4

6

12

13

2

1

7

8

9

10

11

Fig.2

Fig.3

Fig.4

Summary of Contents for ELG02

Page 1: ...S MANUAL ELECTRIC CORDED TILLER WARNING Read carefully and understand all INSTRUCTIONS before operating Failure to follow the safety rules and other basic safety precautions may result in serious pers...

Page 2: ...he proper order We recommend that where possible all items are assembled near to the area in which they will be placed in use to avoid moving the product unnecessarily once assembled Always place the...

Page 3: ...MBOLS ONTHE EQUIPMENT 07 INTRODUCTION 08 DEVICE DESCRIPTION 08 SCOPE OF DELIVERY 09 INTENDED USE 09 SAFETYINFORMATION 09 OPERATION 14 ELECTRICAL CONNECTION 14 TROUBLE SHOOTING GUIDE 17 CLEANINGAND MAI...

Page 4: ...01 https www altonindustries com 02 info altonindustries com Fig 1 3 1 1 9 4 7 6 5 1 3 3 9 1 9 10 3 4 10 FEATURES 5 4 6 12 13 2 1 7 8 9 10 1 1 Fig 2 Fig 3 Fig 4...

Page 5: ...03 https www altonindustries com 04 info altonindustries com 3 1 15 16 14 17 8 7 7 17 7 12 13 2 1 1 3 4 Fig 5 Fig 6 Fig 7 Fig 8 Fig 9 Fig 10...

Page 6: ...20 19 18 6 05 https www altonindustries com 06 info altonindustries com Fig 12 Fig 11...

Page 7: ...nd commissioning the device The operating instructions are intended to help the user to become familiar with the machine and take advantage of its application possibilities in accord ance with the rec...

Page 8: ...es and rm shoes with nonslip soles strong long trou sers ear defenders and goggles Never operate the implement while bare footed or when wearing open sandals Never operate the implement if it is damag...

Page 9: ...ut a visual inspection of the power and extension cables for signs of dam age or ageing lf the power cable for this equipment is damaged it must be replaced by the manufacturer a customer service agen...

Page 10: ...n accidental start up of the implement the throttle handle 1 is equipped with a safety re lease switch 12 which must be pressed before the On O switch 13 can be pressed lf the On O switch 13 is releas...

Page 11: ...carry out a general check of the Electric Tiller and remove all residue col lected Before the start of every season it is ab solutely necessary to check the state of the ma chine Contact our Customer...

Page 12: ...ts in materials or workmanship of the enclosed product Alton Industry Ltd Group will repair or replace any defective materials due to craftsmanship of the product This warranty does not cover any prob...

Page 13: ...1 0 ELG02 ECOMAX 2022 02 23 Allen 157 145X210 h mm...

Reviews: