3.7 components Not Supplied
• Geosystem Detergent Dispenser
• Geosystem Rinse Dispenser
• wiring and wiring connectors
• 1/4" copper tubing and installation fittings
• 440 volt transformers (if required)
• Seal-Tite, fittings and clamps
• 14 GA/ 600 volt insulated wire
• Two Pole Probe
• VANGuARD wash Max
• Pressure Switch
before beginning wiring connections or servicing the
high voltage portion of the system.
All field wiring practices must conform to national electrical
codes and Ecolab
®
Installation Standards. All high voltage
wiring must be a minimum 14 GA./600 volt insulated wire.
wiring from the power source to the transformer must be
enclosed in conduit, seal-tite or other housing approved for
damp locations.
3.5 plumbing requirements
water supply tubing from the source to the solenoid valve
at the GeoCenter, and from the solenoid valve to the
Geosystem Detergent Dispenser will normally be 1/4" O.D.
copper tubing.
Refer to the Installation and Operation Manual
of the
Geosystem Detergent Dispenser used for this application
to aid in the installation of the GeoCenter.
3.6 components Supplied
The GeoCenter includes:
• Detergent Controller P.C. Board
• Solenoid Valve
• 2 30 VA Transformers
• Cell wash Tank Connector
• Rinse Speed Control P.C. Board
• S-2000 cell with 12 foot cable