19. Using the small flathead screwdriver, lift out the screen
retainer. Verify that the holes in it are free of clogs and debris.
20. Again using the small flathead screwdriver, carefully
remove the mesh screen from inside the valve body. The
screen should be taken and rinsed out to remove any debris
fouling it.
21. With the mesh screen removed, look down into the valve
and verify it is not clogged. Remove any foreign objects from
the valve body that would obstruct flow.
22. Reassemble the valve, reversing the steps needed to take
it apart. Replace defective replacement parts with new parts
from ordered kits. Ensure that components are sufficiently
tightened to prevent leakage.
AFTER MAINTENANCE ACTIONS
Reconnect the incoming water (if disconnected) and
turn on. Then restore power to the unit. Run the unit for at
least 10 minutes to ensure there are no leaks. If any problems
arise please contact your Ecolab representative.
SPECIAL PARTS
Repair kit includes: Plunger, Spring, O-ring, and
Diaphragm.
Solenoid Valve Plunger Kit
Includes plunger and spring
Part number 06401-003-07-40
Solenoid Valve Diaphragm Kit
Includes diaphragm and o-ring
Part number 06401-003-07-41 (1/2” NPT)
Part number 06401-003-07-42 (3/4” NPT)
Solenoid Valve 110 Volt Coil and Housing
Part number 06401-003-07-43
Solenoid Valve 230 Volt Coil and Housing
Part number 06401-003-07-43
Complete Solenoid Valve
Part number 04810-100-12-18 (1/2”, 110 Volt)
Part number 04810-100-09-18 (1/2”, 230 Volt)
Part number 04810-100-53-00 (3/4”, 110 Volt)
Part number 04810-100-03-18 (3/4”, 230 Volt)
ES-2000HT INTL Installation & Operation Manual 7610-003-24-90
Issued: 07-10-2006 Revised: N/A
SECTION 5: SERVICE PROCEDURES
RINSE SOLENOID VALVE REPAIR PARTS KIT (CONTINUED)
22
Removing the screen retainer
Removing the mesh strainer screen
View inside the solenoid valve body
Summary of Contents for ES-2000HT INTL
Page 2: ......
Page 6: ...1 SECTION 1 SPECIFICATION INFORMATION...
Page 10: ...5 SECTION 2 INSTALLATION OPERATION INSTRUCTIONS...
Page 17: ...12 SECTION 3 PREVENTATIVE MAINTENANCE...
Page 19: ...14 SECTION 4 TROUBLESHOOTING...
Page 23: ...18 SECTION 5 SERVICE PROCEDURES...
Page 30: ...25 SECTION 6 PARTS SECTION...
Page 51: ...46 SECTION 7 ELECTRICAL SCHEMATCS...
Page 55: ......