Ecodense WT-S DHW 45 H Installation, Operating And Maintenance Manual Download Page 5

 

 

04.12.2020 Rev. 00 

 
 

1.2.

 

General Safety Rules 

 

 

All  personnel  engaged  in  installation,  disassembly,  commissioning,  operation,  control, 

maintenance and repair should have received the necessary training and fully read and understood 
this manual. 

 

No  changes  that  might  damage  the  safety  of  the  device  must  be  made  by  persons  and/or 

organizations on the device.

 

 

All  operation,  commissioning  and  installation  works  (except  for  burning  adjustment)  should  be 

carried  out  when  the  device  is  not  operating  and  after  disconnecting  the  power  supply. 
Noncompliance with these rules  may lead to serious bodily injuries and even death by electrical 
shocks or uncontrolled flame formation. 

 

Repairs concerned with safety elements should be carried out only by the manufacturing company. 

 

The device should never be used by children, mentally handicapped and inexperienced persons.

 

 

Children must not be allowed to play with the device.

 

 

Keep the device away from explosive and flammable materials. 

 

 

 

If you sense gas leakage; 
 

 

Shut down valves of all gas devices.

 

 

Open all doors and windows.

 

 

Do not turn on electric devices or do not turn them off if they are working.

 

 

Do not use burner derived tools such as match and lighter.

 

 

Inform the gas company.

 

 

 
 Do not store any inflammable materials in boiler room. 

 

 

 
Wear hearing protectors if there is noise in boiler room. 
 
 
 

In case of f

ı

re or other emergency; 

 

 

 

Switch off the main switch  

 

Close the main fuel shut-off valve outside the plant. 

 

Take appropriate actions 

 

 
Products should be stored in a dry, cool or dry conditioned places . Storage life of our products 
(service life) is 10 years. 
 

Summary of Contents for WT-S DHW 45 H

Page 1: ...NSTALLATION OPERATING AND MAINTENANCE MANUAL ECODENSE WT S DHW 45 L ECODENSE WT S DHW 45 H ECODENSE WT S DHW 45 XH ECODENSE WT S DHW 55 L ECODENSE WT S DHW 55 H ECODENSE WT S DHW 55 XH ECODENSE WT S D...

Page 2: ...y warnings thoroughly before the use of the device in order to ensure safe cost effective and environmental friendly use If you encounter any issue that is not explained clearly in this manual or you...

Page 3: ...12 8 INSTALLATION 13 8 1 General Controls 13 8 2 Assembly of Condensing Fluid Drain 14 9 ECODENSE CONTROL INSTRUCTIONS BEFORE START UP 15 9 1 Control Panel Description 16 9 2 Display Description 16 9...

Page 4: ...riptions Important information and useful hints Warning of danger to life or property Warning of electrical voltage Product handling information GAZ HATTINI TEM ZLEY N Z CLEAN GAS LINE Clean the gas l...

Page 5: ...ty elements should be carried out only by the manufacturing company The device should never be used by children mentally handicapped and inexperienced persons Children must not be allowed to play with...

Page 6: ...en to the atmosphere and Bird cage should be installed in order to prevent any Bird foreign body entrance a The build up of toxic explosive gas mixtures in the boiler room b Combustion with insufficie...

Page 7: ...es Any damage that may occur during transportation or storage of the product Not preserving the product in its original packaging until the installation stage Incorrect and poor electrical connections...

Page 8: ...04 12 2020 Rev 00 7 3 CONDENSING BOILER GAS FLUE GAS AND HEATING WATER SCHEMA WT S DHW SERIES...

Page 9: ...04 12 2020 Rev 00 8 4 CIRCUIT SCHEMES WT S DHW SERIES...

Page 10: ...rdness ppm F French VDI German Single Boiler 0 50 kW 250 25 14 Single Boiler 50 200 kW 110 11 6 16 Volume to capacity ratio of water in circuit must be higher than 20 I kW Total volume of first filled...

Page 11: ...04 12 2020 Rev 00 10 6 TECHNICAL DATA 6 1 Capacity Table...

Page 12: ...according to the product standards at the time of expansion of the smoke release system when the condensing boiler operates at the maximum heating power MODEL W mm H mm L mm Boyler Tank Volume L WT S...

Page 13: ...12 7 CONDENSING BO LER HANDLING INFORMATION Prevent strong impacts on top of the product and vibration while handling the product Do not leave the product in wet environment Device must be shipped in...

Page 14: ...connections are made with pipes confirming to the standards and that there is no leakage on these connections Ensure that the electric connections are proper Clean the inside of fuel line thoroughly...

Page 15: ...nal effect like frost etc Drain parts must be plastic 3 Boiler condensing outlet must be at least 13 mm Condensing drain must not be changed or clogged after assembly Clogging of condensing drain caus...

Page 16: ...complies with boiler operation instructions In situations where gas pressure is higher than required pressure a regulator must be used 9 Ensure that sensors on boiler feed and circuit outgoing return...

Page 17: ...CH setpoint adjustment K6 DHW setpoint adjustment K3 OFF Info mode selection K7 DHW setpoint adjustment K4 RESET mode 9 2 Display Description S1 DHW mode S9 Solar mode S2 Reset request S10 S17 Water p...

Page 18: ...g boiler is worked on DHW mode and tap symbol will be flashing when condensing boiler works at DHW mode Because of the DHW priority even if the appliance is operating at CH condensing boiler will swit...

Page 19: ...04 12 2020 Rev 00 18 10 ELECTRICAL DIAGRAM AND RELATED CONNECTIONS WT S DHW...

Page 20: ...04 12 2020 Rev 00 19...

Page 21: ...04 12 2020 Rev 00 20...

Page 22: ...the connections of the related terminals in the panel box as shown in the illustration below Closure of Room Thermostat contact generates a heat demand in CH mode If the room thermostat is not connec...

Page 23: ...capacities again and adjust combustion parameters precisely by following above steps After adjustment of parameters are finished close all measurement points as they will be leak proof Flue gas emiss...

Page 24: ...bolts of the boiler Tighten loose bolts After starting the condensing boiler and making required adjustments perform flue gas emission measurement and check if there is an ideal combustion 13 2 Seaso...

Page 25: ...de expected bounds meaning a problem on electronic components E09 Valve feedback error The valve feedback doesn t respect controller commands E12 EEPROM integrity lockout The EEPROM check fails The da...

Page 26: ...Shaky activation of burner Gas pressure Combustion parameters Check the gas pressure and combustion parameters No combustion after ignition Electrode Ionization Check the position state of the electro...

Page 27: ...YE Tel 90 216 442 93 00 Fax 90 216 370 45 03 Factory Contact Details T rkg c OSB B lent Ecevit Bulvar No 11 ORLU TEK RDA T RK YE Tel 90 282 685 44 80 81 Fax 90 282 685 42 09 You can also reach us thro...

Page 28: ...04 12 2020 Rev 00 27 17 NOTES Please record and forward your measurements and observations to us www ecodense com...

Reviews: