SOLUTION RECOMMENDATIONS FOR SOME OF THE PROBLEMS  

 

Problem 

Cause 

Explanation-Recommendation 

Gas smell 

Gas line/Gas 
connections 

Control of leak proofing of connections is required. 
Be sure that measurement points are closed. 

Unburned gas smell 

Flue tightness 

Be sure that flue connections are leak proof and 
measurement points are closed. Check the 
combustion parameters.  

Incomplete combustion 

Gas supply pressure  Check the gas pressure complies with stated 

values. 

Fan problem 

Check the working of fan. 

State of premix 
combustion head and 
heat exchanger 

Check the state of combustion head and heat 
exchanger and ensure that both are clean. 

Combustion air 
connection 

Check that there is nothing that blocks air suction 
and if the impulse connection is correct. 

Shaky activation of burner 

Gas 
pressure/Combustion 
parameters  

Check the gas pressure and combustion 
parameters. 

No combustion after 
ignition 

Electrode/Ionization   Check the position/state of the electrode/ionization 

rod.  

Boiler does not work. 

Electric connection 

Check the fuse and electrical connections. 

Sensor connections 

Ensure that connections of sensors are correct and 
complete. 

Boiler can’t reach the 
desired temperature. 

Gas pressure 

Ensure that gas pressure complies with stated 
values and there is constant gas flow at sufficient 
pressure. 

Heat exchanger 

Control the state of combustion chamber. 

Boiler control 

Control that boiler is at correct operation mod and 
temperature settings. 

Safety valve activates 
often.  

Safety valve 

Ensure that safety valve settings are correct and 
works properly. 

Expansion tank 

Check if it works properly. 

Pump does not work. 

Pump malfunction 

Check the pump electric connections and 
parameters. Change the pump if there is proble in 
pump operation. 

 
 
 
 
 
 

 

Summary of Contents for WT-S DHW 45 H

Page 1: ...NSTALLATION OPERATING AND MAINTENANCE MANUAL ECODENSE WT S DHW 45 L ECODENSE WT S DHW 45 H ECODENSE WT S DHW 45 XH ECODENSE WT S DHW 55 L ECODENSE WT S DHW 55 H ECODENSE WT S DHW 55 XH ECODENSE WT S D...

Page 2: ...y warnings thoroughly before the use of the device in order to ensure safe cost effective and environmental friendly use If you encounter any issue that is not explained clearly in this manual or you...

Page 3: ...12 8 INSTALLATION 13 8 1 General Controls 13 8 2 Assembly of Condensing Fluid Drain 14 9 ECODENSE CONTROL INSTRUCTIONS BEFORE START UP 15 9 1 Control Panel Description 16 9 2 Display Description 16 9...

Page 4: ...riptions Important information and useful hints Warning of danger to life or property Warning of electrical voltage Product handling information GAZ HATTINI TEM ZLEY N Z CLEAN GAS LINE Clean the gas l...

Page 5: ...ty elements should be carried out only by the manufacturing company The device should never be used by children mentally handicapped and inexperienced persons Children must not be allowed to play with...

Page 6: ...en to the atmosphere and Bird cage should be installed in order to prevent any Bird foreign body entrance a The build up of toxic explosive gas mixtures in the boiler room b Combustion with insufficie...

Page 7: ...es Any damage that may occur during transportation or storage of the product Not preserving the product in its original packaging until the installation stage Incorrect and poor electrical connections...

Page 8: ...04 12 2020 Rev 00 7 3 CONDENSING BOILER GAS FLUE GAS AND HEATING WATER SCHEMA WT S DHW SERIES...

Page 9: ...04 12 2020 Rev 00 8 4 CIRCUIT SCHEMES WT S DHW SERIES...

Page 10: ...rdness ppm F French VDI German Single Boiler 0 50 kW 250 25 14 Single Boiler 50 200 kW 110 11 6 16 Volume to capacity ratio of water in circuit must be higher than 20 I kW Total volume of first filled...

Page 11: ...04 12 2020 Rev 00 10 6 TECHNICAL DATA 6 1 Capacity Table...

Page 12: ...according to the product standards at the time of expansion of the smoke release system when the condensing boiler operates at the maximum heating power MODEL W mm H mm L mm Boyler Tank Volume L WT S...

Page 13: ...12 7 CONDENSING BO LER HANDLING INFORMATION Prevent strong impacts on top of the product and vibration while handling the product Do not leave the product in wet environment Device must be shipped in...

Page 14: ...connections are made with pipes confirming to the standards and that there is no leakage on these connections Ensure that the electric connections are proper Clean the inside of fuel line thoroughly...

Page 15: ...nal effect like frost etc Drain parts must be plastic 3 Boiler condensing outlet must be at least 13 mm Condensing drain must not be changed or clogged after assembly Clogging of condensing drain caus...

Page 16: ...complies with boiler operation instructions In situations where gas pressure is higher than required pressure a regulator must be used 9 Ensure that sensors on boiler feed and circuit outgoing return...

Page 17: ...CH setpoint adjustment K6 DHW setpoint adjustment K3 OFF Info mode selection K7 DHW setpoint adjustment K4 RESET mode 9 2 Display Description S1 DHW mode S9 Solar mode S2 Reset request S10 S17 Water p...

Page 18: ...g boiler is worked on DHW mode and tap symbol will be flashing when condensing boiler works at DHW mode Because of the DHW priority even if the appliance is operating at CH condensing boiler will swit...

Page 19: ...04 12 2020 Rev 00 18 10 ELECTRICAL DIAGRAM AND RELATED CONNECTIONS WT S DHW...

Page 20: ...04 12 2020 Rev 00 19...

Page 21: ...04 12 2020 Rev 00 20...

Page 22: ...the connections of the related terminals in the panel box as shown in the illustration below Closure of Room Thermostat contact generates a heat demand in CH mode If the room thermostat is not connec...

Page 23: ...capacities again and adjust combustion parameters precisely by following above steps After adjustment of parameters are finished close all measurement points as they will be leak proof Flue gas emiss...

Page 24: ...bolts of the boiler Tighten loose bolts After starting the condensing boiler and making required adjustments perform flue gas emission measurement and check if there is an ideal combustion 13 2 Seaso...

Page 25: ...de expected bounds meaning a problem on electronic components E09 Valve feedback error The valve feedback doesn t respect controller commands E12 EEPROM integrity lockout The EEPROM check fails The da...

Page 26: ...Shaky activation of burner Gas pressure Combustion parameters Check the gas pressure and combustion parameters No combustion after ignition Electrode Ionization Check the position state of the electro...

Page 27: ...YE Tel 90 216 442 93 00 Fax 90 216 370 45 03 Factory Contact Details T rkg c OSB B lent Ecevit Bulvar No 11 ORLU TEK RDA T RK YE Tel 90 282 685 44 80 81 Fax 90 282 685 42 09 You can also reach us thro...

Page 28: ...04 12 2020 Rev 00 27 17 NOTES Please record and forward your measurements and observations to us www ecodense com...

Reviews: