background image

866.463.2611 • www.ecosystemsdisplays.com

Step 3

12

Curved Header Horizontal

Backwall 

Vertical

Cam Lock

*

*

*

*

*

*

*

*

*

*

*

*

*

*

12A

13

13A

14

14A

15

15A

15B

15C

Header to Backwall

Attachment

Cam Lock Detail

Place Cam Locks of 

Backwall Verticals into

groove of Header 

Horizontals, then tighten 

set screw to secure.

Tighten 

set screw 

to secure.

Place Lock

into groove

Steps:

1) Connect Curved Horizontals [12-13-14 & 12A-13A-14A] together (see Horizontal Inline Detail).

2) Connect Verticals [15, 15A, 15B, 15C] between assembled Horizontals as shown (see Cam Lock Detail). 

3) Attach assembled header to assembled backwall as shown (see Detail). 

Item

12/12A

13/13A

14/14A

15/15A/15B/15C

Qty.

1/1

1/1

1/1

1/1/1/1

Description

39.097” Curved Horizontal Extrusion

39.097” Curved Horizontal Extrusion

39.097” Curved Horizontal Extrusion

13.48” Vertical Extrusion

Summary of Contents for ECO-1056

Page 1: ...866 463 2611 www ecosystemsdisplays com Setups Order 49478 ECO 1056 eSmart 10 x10 Sustainable Hybrid Display Plan View Perspective View 10 10 ...

Page 2: ...g Instructions for Setups Packing Inline Connection between Extrusions Baseplate Connection for Vertical Extrusions Cleaning and Packing Use non abrasive cleaners when cleaning extrusions or ECO Glass inserts Use mild cleaners and soft materials such as cotton to clean all laminates Keep exhibit components away form extreme heat and long exposure to sun light This will prevent warping and fading R...

Page 3: ... hiding threads and tuck silicon edge and fabric into corners After corners are complete slide in the rest of the graphic into channel From edges to center 3 5 Graphic is installed Stand back and be amazed Place ECO panel together with a vertical offset slide down to lock connector in place Panel Corner Connectors are installed just like ECO panels Remove by off setting top lock clips horizontally...

Page 4: ...866 463 2611 www ecosystemsdisplays com Case 1 Top View of Each Level Level 1 Level 2 Level 3 Level 4 Wings 4A 2A 3 14A 14 12 13 11 13A 12A 15 15C 2 3A 4 Set Up Hardware 6A 8A 5 8 6 5A ...

Page 5: ...866 463 2611 www ecosystemsdisplays com Case 2 Top View of Each Level Level 1 Level 2 Level 3 Shelf Shelf Shelf Graphic 7A 7 Base Plates Base Plates Lights Graphic ...

Page 6: ... Vertical Extrusions 5 6 7 8 2 Connect Verticals 5A 6A 7A 8A to ends of Verticals 5 6 7 8 3 Connect Horizontals 2 3 2A 3A together 4 Connect assembled Horizontals between Verticals 6 6A 7 7A 5 Connect Horizontals 4 4A between assembled Verticals 7 7A 8 8A 6 Connect Horizontal 9 between Verticals 5 5A 6 6A 7 Attach Curved Horizontal 10 to top of Vertical 8A 8 Attach Vertical 11 to end of Horizontal...

Page 7: ...3 2611 www ecosystemsdisplays com Step 2 When assembled Steps 1 Attach wings to Verticals with Standoff Caps as shown 2 Attach Shelves to Verticals with Cam Locks 3 Connect lights to top Horizontal Extrusions ...

Page 8: ...crew to secure Place Lock into groove Steps 1 Connect Curved Horizontals 12 13 14 12A 13A 14A together see Horizontal Inline Detail 2 Connect Verticals 15 15A 15B 15C between assembled Horizontals as shown see Cam Lock Detail 3 Attach assembled header to assembled backwall as shown see Detail Item 12 12A 13 13A 14 14A 15 15A 15B 15C Qty 1 1 1 1 1 1 1 1 1 1 Description 39 097 Curved Horizontal Extr...

Reviews: