
12. Front Panel
Front Panel
When a Non-Urgent Alarm is indicated the charge cycle has still
completed and in most cases can be disregarded.
When an Urgent Alarm is indicated, the charge cycle has not been
completed and the occurrence must be reported to a Supervisor
,
your servicing battery dealer or DC Power Technologies at
844-ECO-CHRG.
Controller display.
Displays information depending on the status of the charger.
1
4
START
/
STOP
rocker switch.
0 = Stop charge.
I = Start charge.
5
READY
/
CHARGING
indicator lights.
RED steady on, GREEN off = Charging.
RED off, GREEN steady on = Charge complete.
RED flashing, GREEN off = Non-Urgent Alarm.
RED flashing, GREEN flashing = Urgent Alarm.
3
Mini USB port.
2
Controller push buttons (Set Equalize Charge).
To enable equalize next cycle, plug in the battery
but before setting the rocker switch to
START
:
- Press button to set equalize next cycle.
- Press ENTER to allow changing.
- Press to select “Enable”.
- Press ENTER to accept change.
- Press to select “Store”.
- Press ENTER to accept.
- Press to return to “Connect Battery”.
- Set the rocker switch to
START
.
Summary of Contents for FS3
Page 1: ......
Page 9: ...FS3 Block Diagram 9 FS3 Block Diagram...
Page 11: ...Operating Instructions 11 4 8 2 6 9 7 3 5 1...
Page 22: ...22 Exploded View Exploded View...
Page 27: ......
Page 29: ......