background image

Setup Instructions 

 
This adjustable bed rail is designed to be installed between the box spring and mattress of the 
bed. 
Please follow these steps: 

1.

 

Remove the contents from the carton. 
 

2.

 

Remove the mattress from the box spring. 
 

3.

 

Attach  the  end  cross brace  (Part  A)  to  the  left  and  right  base  support frames  (Part  B 
and  Part  C)  by  inserting  the  open-ended  sides  (with  the  lock  spring  pins)  of  the  end 
cross  brace  into  the  longer  lengths  of  tube  of  the  base  support  frames.  Depress  the 
lock  spring  pins  to  insert  both  sides  of  the  end  cross  brace  fully  into  the  support 
frames. The parts are connected when the lock spring pins of the cross brace are lined 
up  with  the  positioning  holes  of  the  support  frame  and  have  ‘snapped’  through  the 
positioning holes. 
 

4.

 

Attach the padded hand brace (Part D) to the left and right side of the support frame by 
inserting the open-

ended sides of the hand brace into the hollow ‘T’ section on either 

side of the base support frame. Visually check that the holes of the padded hand brace 
and of the base support frame are lined up. When you observe that the holes are lined 
up  on  each  side,  insert  a  locking  collar  (Part  E)  through  each  hole.  The  parts  are 
connected  when  the  locking  collar  pins  are  fully  inserted  through  the  holes  and  the 
collars are ‘wrapped’ around the legs of the hand brace. At this point, it is necessary to 
determine the height of the bed rail handle. 

 
5.

 

You may  now choose to  attach the optional magazine bag. Velcro the top of the bag 
over the middle horizontal bar. Attach remaining side Velcro straps (4) to the sides. 
 

6.

 

Place the assembled bed rail on top the box spring. 
 

7.

 

Locate a convenient distance from the head of the bed to position the bed rail. 
 

8.

 

Unfold the two long straps and lay them flat across the top of the box spring. 
 

9.

 

Secure the frame to the box spring by  looping both straps under and around the box 
spring  and  buckling  them  to  the  short  straps  on  either  side  of  the  frame.  Adjust  and 
tighten by pulling on the loose ends of the straps. 
 

10.

 

Place the mattress on top of the bed rail support frame. 
 

11.

 

After the bed rail is installed on the bed, remove the locking collars to adjust the handle 
to the desired height. Push the handle down or pull it up to the desired height, making 
sure that both holes are lined up, and reinsert the two locking collars. Be sure that the 
locking pins on the locking collars go through the tubing and protrude on the opposite 
side. 
 

12.

 

The adjustable bed rail is now ready to be used. 

Summary of Contents for EBR-11

Page 1: ...Adjustable Bed Rail EBR 11 ...

Page 2: ...Features Bed rail shown with only 1 cross bar A C B D E ...

Page 3: ...lar Part E through each hole The parts are connected when the locking collar pins are fully inserted through the holes and the collars are wrapped around the legs of the hand brace At this point it is necessary to determine the height of the bed rail handle 5 You may now choose to attach the optional magazine bag Velcro the top of the bag over the middle horizontal bar Attach remaining side Velcro...

Page 4: ...er foam parts velcro bag and painted surfaces This warranty does not include labour charges or shipping charges incurred by the purchaser when returning defective product for repair or replacement Warranty service must be performed by an authorized Eclipse Medical Inc dealer Do not return faulty defective parts without written authorization This warranty is void if the original serial number label...

Page 5: ...Barrière de lit ajustable EBR 11 ...

Page 6: ...Caractéristiques Barrière de lit illustrée ici avec une seule barre A C B D E ...

Page 7: ...tées quand les ergots de la bague de blocage sont complètement insérés dans les trous et que les bagues sont enroulées autour des tubes de la barre d appui À ce stade il faut déterminer à quelle hauteur il faut placer la poignée de la barre d appui 5 À ce point on peut attacher la pochette pour revues optionnelle Fixer le haut de la pochette sur la barre horizontale centrale à l aide de la bande v...

Page 8: ...te et les surfaces peintes La présente garantie n inclut pas les frais de main d œuvre ni les frais d expédition encourus par l acheteur pour retourner les produits défectueux en vue de leur réparation ou de leur remplacement L entretien sous garantie doit être fait par un Dépositaire agréé de Produits médicaux Éclipse inc Ne retournez pas de pièces comportant un défaut une défectuosité sans autor...

Reviews: