background image

PAS R

APID

 L

OADER

TM

 T

RIMMER

 A

TTACHMENT

O

PERATOR

'

S

 M

ANUAL

9

NYLON

 

LINE

 

HEAD

 

INSTALLATION

1.

Align hole in upper plate with notch in edge of gear housing and
insert head locking tool (A). Remove plastic sleeve from PTO shaft.

2.

Be sure upper plate (B) remains on PTO shaft.

3.

Place line head onto PTO shaft, followed by large metal washer (C).

4.

Thread L.H. nut (D) on PTO shaft. Tighten securely.

5.

Install new split pin (E).

6.

Remove locking tool (A).

O

PERATION

NOTE
Refer to your Split Boom\Pro Attachment Series

TM

 Operator's Manual for correct engine fueling, starting and stopping

instructions.

IMPORTANT
Never wear line shorter than 1-1/2 inch extension from head, otherwise overspeeding and engine damage may result.

C

Summary of Contents for PAS-260/261

Page 1: ...210SB 211SB SRM 260SB 261SB PAS 2100 TYPE 1E PAS 2400 TYPE 1E PAS 2601 TYPE 1E PAS 210 211 PAS 230 231 PAS 260 261 WARNING DANGER Readrulesforsafeoperationandinstructionscarefully ECHOprovidesanOpera...

Page 2: ...INTRODUCTION Welcome to the ECHO family This ECHO product was designed and manufactured to provide long life and on the job dependability Read and understand this manual and the SAFETY MANUAL you fou...

Page 3: ...ft Choke Control Cold Start Position Choke Closed Choke Control Run Position ChokeOpen INTERNATIONAL SYMBOLS IMPORTANT The enclosed message provides information necessary for the protection of the un...

Page 4: ...e operator fatigue which may lead to heat stroke Schedule heavy work for early morning or late afternoon hours when temperatures are cooler Vibration and Cold It is believed that a condition called Ra...

Page 5: ...o strengthen the hand and arm muscles Immediately stop using all power equipment and consult a doctor if you feel tingling numbness or pain in the fingers hands wrists or arms The sooner RSI CTS is di...

Page 6: ...mbly includes the Cut Off Knife Mounts on the Gear Housing Assembly just above the cutting attachment Helps protect the operator by deflecting debris produced during the trimming operation This shield...

Page 7: ...mbly ASSEMBLY WARNING DANGER Do not perform maintenance or assembly procedures with engine running Tools Required Screwdriver HeadLockingTool 17x14 5mmWrench Needle Nose Pliers Parts Required Power He...

Page 8: ...ield into gear case 4 Assemble upper plate C onto PTO shaft C E D 6 Rotate locator pin A 1 4 turn clockwise to engage lower shaft hole Insure locator pin is fully engaged by gently twistinglower drive...

Page 9: ...ns on PTO shaft 3 Place line head onto PTO shaft followed by large metal washer C 4 Thread L H nut D on PTO shaft Tighten securely 5 Install new split pin E 6 Removelockingtool A OPERATION NOTE Refer...

Page 10: ...cialized tools may be required Level3 Experiencerequired Specializedtoolsarerequired MAINTENANCE INTERVALS Component System Maintenance Procedure Skill Level Frequency DriveShaft Grease 1 Every 25 hou...

Page 11: ...ield 1 Loosen two 2 8 mm upper gear housing bolts B and locator screw C Remove gear case assembly 2 Remove flex cable wipe clean and apply a thin coating 15 ml of grease 3 Install flex cable Make sure...

Page 12: ...ttchment Height 229mm 9in Weight dry w blade 1 36kg 3 1lb DriveShaft 6 35mm 1 4in FlexShaft RotatingDirection Counter clockwise viewed from the top Cutter Head Rapid Loader TM head 2 lines with 095 Cr...

Page 13: ...PAS RAPID LOADERTM TRIMMER ATTACHMENT OPERATOR S MANUAL 13 NOTES...

Page 14: ...14 NOTES...

Page 15: ...PAS RAPID LOADERTM TRIMMER ATTACHMENT OPERATOR S MANUAL 15 NOTES...

Page 16: ...tance or have questions concerning the application operation or maintenance of this product you may call the ECHO ConsumerProductSupportDepartmentat1 800 673 1558from8 30am to 4 30 pm Central Standard...

Reviews: