background image

 

 

Quick Guide - SBU IO-Link 
 

 

 

 
Page 9 of 10 

 

                 

 

D) 

Storage, packaging and transport  

D01 

Storage 

If you do not install the SBU IO-Link  immediately, ensure suitable storage conditions in dry, dust-free, frost-free indoor 
rooms protected against sunlight. Wrap the SBU IO-Link  in cardboard, plastic or film packaging. 
In order to keep the unused SBU IO-Link  in a functional condition even over a maximum period of six months, please 
observe the following storage conditions: 

 

the storage room should be dry and free from dust. 

 

the storage temperature should be b 5 °C and + 40 °C. 

 

the SBU IO-Link  should be stored on a level floor. 

 

the SBU IO-Link  should be protected against inadvertent movements and damage. 

 

the SBU IO-Link  should be protected against static discharge.  

D02 

Packaging 

The complete SBU IO-Link  from EBRO ARMATUREN Gebr. Bröer GmbH is packed safely and fit for purpose in 
accordance with the transport route and destination.  

 

D03 

Transport in general 

Unless agreed otherwise, the SBU IO-Link  will be delivered fully factory-preassembled by EBRO ARMATUREN Gebr. 
Bröer GmbH.  
For the transport, observe the specified weights and dimensions in the delivery documents of the SBU IO-Link . 
The SBU IO-Link  should be kept in the factory packaging until use or installation. The specified storage conditions 
must be adhered to. 

 

 

On arrival at the destination the completeness of the shipment must be checked 
immediately against the shipping documents and packing lists; the intactness of 
the shipment must also be checked.  

EBRO ARMATUREN Gebr. Bröer  GmbH is to be notified immediately in case of 
complaints. 
                                                                                                             

 

INFO 

 

 

 

 

Summary of Contents for SBU IO-Link

Page 1: ...ns not all possible type variants are shown Quick Guide in accordance with the EU RED Directive 2014 53 EU in accordance with the EC Machinery Directive 2006 42 EC English language version Revision 00...

Page 2: ...5 B02 MOUNTING THE SBU IO LINK ON THE QUARTER TURN ACTUATOR 5 B03 ELECTRICAL CONNECTION 6 B04 COMMISSIONING 6 B05 ERRORS IN GENERAL 8 B07 ERRORS CAUSE REMEDIAL ACTION 8 D STORAGE PACKAGING AND TRANSP...

Page 3: ...ly instructions can be downloaded from our website www ebro armaturen com These original assembly instructions as well as all other information necessary for safe use must be available to all persons...

Page 4: ...ers The SBU IO Link is suitable only for the non explosive zone and may be operated only with a 24 V DC power supply The SBU IO Link is used only in an area that is not potentially explosive The SBU I...

Page 5: ...are required for all other interfaces The SBU IO Link may only be operated with the accessories foreseen and approved by EBRO ARMATUREN Gebr Br er GmbH The SBU IO Link should be mounted as follows Un...

Page 6: ...The associated circuit diagram is affixed inside the inner housing cover Connect the SBU IO Link in accordance with the permissible voltage All electrical connections to the user side controller are t...

Page 7: ...ly to the respective terminal see wiring diagram J8 Control SV1 Set Not set Control via IO Link external Control via IO Link Control by external signal J9 Control SV2 Set Not set Control via IO Link e...

Page 8: ...connected properly If the red LED lights up the power supply polarity is reversed Correct polarity of the power supply is signalled by the green LED B06 Collective error Errors are signalled by the f...

Page 9: ...BU IO Link should be protected against static discharge D02 Packaging The complete SBU IO Link from EBRO ARMATUREN Gebr Br er GmbH is packed safely and fit for purpose in accordance with the transport...

Page 10: ...Quick Guide SBU IO Link Page 10 of 10...

Reviews: