background image

 

 

Quick Guide - SBU IO-Link 
 

 

 

 
Page 7 of 10 

 

                 

Jumper 

 

     

 

 

J1 

+3.3 V reference for 

Set 

Not set 

 

Power supply for 
Bluetooth module 

Bluetooth module active 

Bluetooth module inactive 

J7 

GND reference for 

Set 

Not set 

 

Power supply 
solenoid valves GND 

GND related to operating 
voltage GND 

0V potential for the SV 
connections must be 
applied separately to the 
respective terminal (see 
wiring diagram) 

J8 

Control SV1 

Set 

Not set 

 

Control via  
IO-Link / external 

Control via IO-Link 

Control by external signal 

J9 

Control SV2 

Set 

Not set 

 

Control via  
IO-Link / external 

Control via IO-Link 

Control by external signal 

 

 

 
 
Danger due to incorrect operation. 

 
Malfunctions of, or damage to components. 
 
The SBU IO-Link  may only be connected by an electrician. 
 
For external control signals for the solenoid valves, the jumpers J7, J8 and J9 

must

 be removed 

and the wiring diagram must be observed. 

CAUTION 

 

 

 

Summary of Contents for SBU IO-Link

Page 1: ...ns not all possible type variants are shown Quick Guide in accordance with the EU RED Directive 2014 53 EU in accordance with the EC Machinery Directive 2006 42 EC English language version Revision 00...

Page 2: ...5 B02 MOUNTING THE SBU IO LINK ON THE QUARTER TURN ACTUATOR 5 B03 ELECTRICAL CONNECTION 6 B04 COMMISSIONING 6 B05 ERRORS IN GENERAL 8 B07 ERRORS CAUSE REMEDIAL ACTION 8 D STORAGE PACKAGING AND TRANSP...

Page 3: ...ly instructions can be downloaded from our website www ebro armaturen com These original assembly instructions as well as all other information necessary for safe use must be available to all persons...

Page 4: ...ers The SBU IO Link is suitable only for the non explosive zone and may be operated only with a 24 V DC power supply The SBU IO Link is used only in an area that is not potentially explosive The SBU I...

Page 5: ...are required for all other interfaces The SBU IO Link may only be operated with the accessories foreseen and approved by EBRO ARMATUREN Gebr Br er GmbH The SBU IO Link should be mounted as follows Un...

Page 6: ...The associated circuit diagram is affixed inside the inner housing cover Connect the SBU IO Link in accordance with the permissible voltage All electrical connections to the user side controller are t...

Page 7: ...ly to the respective terminal see wiring diagram J8 Control SV1 Set Not set Control via IO Link external Control via IO Link Control by external signal J9 Control SV2 Set Not set Control via IO Link e...

Page 8: ...connected properly If the red LED lights up the power supply polarity is reversed Correct polarity of the power supply is signalled by the green LED B06 Collective error Errors are signalled by the f...

Page 9: ...BU IO Link should be protected against static discharge D02 Packaging The complete SBU IO Link from EBRO ARMATUREN Gebr Br er GmbH is packed safely and fit for purpose in accordance with the transport...

Page 10: ...Quick Guide SBU IO Link Page 10 of 10...

Reviews: