Quick Guide - SBU IO-Link
Page 6 of 10
B03
Electrical connection
The associated circuit diagram is affixed inside the inner housing cover.
Connect the SBU IO-Link in accordance with the permissible voltage.
All electrical connections to the user-side controller are to be checked by an electrician before the initial
commissioning.