ebm-papst K3G560-AP23-90 Operating Instructions Manual Download Page 11

Operating instructions

K3G560-AP23-90

`

II 2G Ex db eb ib IIB T3 Gb

IBExU14ATEX1122 X /04

`

Translation of the original operating instructions

54006-4-8670

Fig. 4: Connecting wires to terminals (example)

There must be no mechanical stress acting between the terminal and the
cable gland. The cable must be relieved of strain.

Fig. 5: Secure the brackets (included in terminal box) for strain relief of
the wires

Fig. 6: Strain relief for shielded wires

The strain relief acts on the cable sheath, eliminating strain on
the leads.

DANGER
Risk of explosion due to poorly sealed terminal box.

The terminal box cover, its seal and the contact surface on the
housing must not be soiled or damaged.
→ Clean the contact surfaces if soiled; heed the section on

cleaning.# If the device is damaged, send it to ebm-papst for
repair or replacement.

The terminal box is only properly sealed if the terminal box
screw connections and cable glands have been tightened to the
specified torque.

5.3.3.1 Replacement of cable glands and screw plugs

If you would like to replace cable glands or screw plugs, for example
because they have been lost or become worn out, they must have the
following characteristics.

CAUTION

Required properties for cable glands and screw plugs:- Ex e
approval
- Usage temperature -40°C to 85°C
- Connection thread M20 x 1.5 mm or M25 x 1.5 mm
- Sizing corresponding to cable diameter
- Material: Nickel-plated brass or stainless steel

5.3.4 Cable routing

Water must be prevented from reaching the cable gland along the cable.
To relieve strain on the cables, we recommend fastening the cables at
intervals of 10 cm.

Fans installed lying flat

Make sure the cables are routed in a U-shaped loop.

Fig. 7: Fan installed lying flat, cable routed in a U-shaped loop.

Item no. 54006-5-9970 · ENU · Change 93219 · Approved 2018-02-08 · Page 11 / 16

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Summary of Contents for K3G560-AP23-90

Page 1: ...instructions are available in other languages on our website www ebmpapst com 2 2 SAFETY REGULATIONS AND INFORMATION 2 2 1 Hazard levels for warnings 2 2 2 Staff qualifications 2 2 3 Basic safety rul...

Page 2: ...urpose in a safe manner with attention to potential dangers and in accordance with the operating instructions No modifications additions or conversions are to be made to the device for example changes...

Page 3: ...n and operating conditions the sound pressure level may exceed 70 dB A Risk of noise induced hearing loss Take appropriate technical safety measures Protect operating personnel with appropriate safety...

Page 4: ...devices Using the device only in Zones 1 and 2 with Ex categories IIA and IIB and temperature classes T1 to T3 Using the device only in stationary systems Using the device only in speed ranges without...

Page 5: ...er min 10 mm max 14 mm tightening torque 6 0 6 Nm standard value depending on cable 6 Terminal box fastening screws tightening torque 3 5 0 5 Nm 7 Ground connection point M8 functional ground for elec...

Page 6: ...ng Technical features Output 10 VDC max 10 mA Output 20 VDC max 50 mA Output for slave 0 10 V Operation and alarm display Input for sensor 0 10 V or 4 20 mA External 24 V input parameter setting Exter...

Page 7: ...production Six digit number e g 000003 Sequential serial number Ex marking II 2G Ex db eb ib IIB T3 Gb Element Explanation Ex marking according to 2014 34 EU II Equipment group II use above ground no...

Page 8: ...connection should be isolated from vibration e g using compensators or similar elements Ensure stress free attachment of the fan to the substructure Check the device for transport damage Damaged devi...

Page 9: ...the terminal box from ebm papst have been inspected for suitability The motor must be connected in accordance with EN 60079 14 Ground conductor contact resistance according to EN 61800 5 1 Compliance...

Page 10: ...3 Connecting wires to terminals Open the terminal box To do so unscrew the seven screws for tightening torque see Chapter 4 1 Product drawing Take care when opening the terminal box cover Do not dama...

Page 11: ...box screw connections and cable glands have been tightened to the specified torque 5 3 3 1 Replacement of cable glands and screw plugs If you would like to replace cable glands or screw plugs for exa...

Page 12: ...y settings Factory settings made for the device by ebm papst Mode parameter set 1 PWM control Mode parameter set 2 PWM control Fan device address 1 Max PWM 100 Min PWM 5 1 Save set value to EEPROM Yes...

Page 13: ...tput of current motor modulation level motor speed adjustable curve SELV 2 Din 2 Digital input 2 Switching parameter sets 1 2 according to EEPROM setting the valid or used parameter set can be selecte...

Page 14: ...sonant frequencies must be determined in the course of fan commissioning Either run through the resonant range as quickly as possible with speed control or find another remedy Operation with excessive...

Page 15: ...oved during cleaning Motor not turning Mechanical blockage Switch off isolate from supply and remove mechanical blockage Line voltage faulty Check line voltage restore power supply Attention The error...

Page 16: ...e device Cable routing fastening Visual inspection At least every 6 months Fasten cables Cleaning and preventive maintenance Visual inspection At least every 3 months Remove dirt clean device Ball bea...

Reviews: