Operating instructions
K3G097-AK32-70
Translation of the original operating instructions
4.4 Connection diagram
Drawing preliminary!
No.
Conn.
Designation
Function/assignment
1.1
+UB
Power supply
1.2
GND
Power supply GND, reference ground
1.3
100%, PWM/LIN
100% speed, analog voltage control input 0-10 V or PWM
1.4
80%
80% speed
1.5
60%
60% speed
1.6
NC
Not used / no function
Item no. 54620-5-9970 · ENU · Change 89188 · Approved 2016-04-18 · Page 7 / 10
ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com