XSTORAGE HOME POWER METERS MANUAL

   MN700001EN   March 2019   www.eaton.com/xstorage

The Eastron SDM630MV-CT belongs to the 630 series. The 

meter works in combination with the current transformer (CT) 

as it is shown in the picture below. The current transformer is 

Eastron that belongs to the ESCT-TU16 series.

Figure 28: Eastron SDM630MV-CT and current transformer 

(CT) product overview

The dimensions [mm] of the meter are as shown below:

Figure 29: Eastron SDM630MV-CT

The DIN rail mount construction enables the power meter to 

be installed in a compact electrical distribution box (Figure 30).

Figure 30: DIN Rail mount for Eastron meter

The unit can be configured to operate with the current 

transformer (CT) with a 0.33V output. The secondary CT 

is fixed to 0.33V, and the primary is optional. During the 

installation of the power meter, no additional protective 

devices are required. The meter connection terminals must 

be directly connected to the L1, L2, L3 (lines) and N (neutral) 

wires. The split core CT is installed on the L1, L2, L3 phases 

in the same direction as the current. An auxiliary power 

source that supplies the power meter must be added as it is 

described in the figure 31.

Figure 31: Three phase and four wires connection with the 

auxiliary power source

6.  Eastron SDM630MV-CT: Technical 

specifications, installation and wiring

The figure 32 shows how to wire the Eastron meter as power 

meter 1 (EM1) and power meter 2 (EM2) in case of a general 

installation. Please be sure that power meter 2 is installed on 

the same phase of the xStorage Home system and the existing 

PV inverter.

Figure 32: How to wire the Eastron meter for a general 

installation

Non critical load

CTs

CTs

Power

meter

Power

meter

EM2

Solar

inverter

DC in/out

BA

T-

BA

T+

L1

L1

Current input

Current input

Voltage input

Voltage input

L2

L2

L3

L3

N

L1

DC

L2

L3

N

N

Summary of Contents for xStorage Home Series

Page 1: ...xStorage Home Power Meters Manual For 4 2 kWh 6 kWh and 10 kWh systems capacity This document is intended for Eaton certified installers xStorage Home...

Page 2: ...know 3 3 SFERE DDS1946 DS Technical specifications installation and wiring 4 4 SFERE DTS1946 DS Technical specifications installation and wiring 8 5 Eastron SDM120CT Technical specifications installat...

Page 3: ...ustomer service we provide all specifications contained in this document are subject to change with due notice All drawings descriptions or illustrations contained in this document serve to provide a...

Page 4: ...nterface 2 the energy pulse indication light 3 the menu navigation keys 4 the model number Figure 3 SFERE DDS1946 DS product dimensions Figure 4 DIN rail mounting style overview Figure 5 Terminal wiri...

Page 5: ...UI to record the event history and to display the current energy consumption of both the critical and non critical loads as well as to track the PV generated energy as applicable The general wiring of...

Page 6: ...r both power meters with the exception of their assigned addresses Enter the programming mode as described 1 Power up the meter and irrespective of the measurement message displayed see display exampl...

Page 7: ...interface Please follow the instructions provided in the complementary xStorage Home user interface onboarding process manual 6 Again press to enter the third level menu This will display the default...

Page 8: ...re required The meter connection terminals must be directly connected to the L1 L2 L3 lines and N neutral wires Figure 16 L1 L2 L3 and N left side in the diagram is the side connected to the xStorage...

Page 9: ...id inverter The wiring of the RS 485 port terminals of the hybrid inverter and the power meters terminals is illustrated in Figure 19 Connect the RS 485 terminals of the power meter to the RS 485 term...

Page 10: ...ensure the activation of the correct measuring mode and the correct communications flow to the xStorage Home system i e to its hybrid inverter unit The following illustrations explain the communicatio...

Page 11: ...ied data and return to second level menu or b and at the same time to cancel the data modification and return to the second level menu 9 Press and to return to the first level menu i e the communicati...

Page 12: ...mpact electrical distribution box Figure 24 Figure 24 DIN Rail mount for Eastron meter During the installation of the power meter no additional protective devices are required The meter connection ter...

Page 13: ...appropriate meter is selected from the user interface The procedure starts with EM2 and then needs to be repeated for EM1 Please refer to the xStorage Home user interface onboarding process manual to...

Page 14: ...he power meter no additional protective devices are required The meter connection terminals must be directly connected to the L1 L2 L3 lines and N neutral wires The split core CT is installed on the L...

Page 15: ...r the correct password default 1000 before processing From the set up menu use the M and P buttons to select Address ID Press the Enter button to enter the selection routine The current setting will b...

Page 16: ...e la Longeraie 7 1110 Morges Switzerland Eaton com xstorage 2019 Eaton All Rights Reserved Publication No MN700001EN CSSC 1503 March 2019 Eaton is a registered trademark All other trademarks are prope...

Reviews: