Instructional Leaflet 

IL03902001E

Effective February 2011

S811 quick installation guide

 

 

eaton corporation

 www.eaton.com

Table 1.  Settings  for Typical Applications

parameter

Factory  

Setting

pump 

a

Fan

Unloaded  

conveyor

rock  

crusher

Saw

compressor

Configuration Menu

Overload trip FLA

21

Motor FLA

Motor FLA

Motor FLA

Motor FLA

Motor FLA

Motor FLA

Overload trip class

5

20

20, 30

20

30

30

20

Start method

0 (voltage ramp)

3 (pump control)

0 (voltage ramp)

0 (voltage ramp) 

b

0 (voltage ramp) 

b

0 (voltage ramp) 

b

0 (voltage ramp) 

b

Soft start time

20

20

40

20

30

30–50

10

Initial torque

25

55

65

50

70

65

45

Kick start time

0

0

0

0

85

0

0

Kick start torque

0

0

0

0

2

0

0

Soft stop time

0

N/A

0

Load dependent

0

0

2

Pump stop time

120

30

0

0

0

0

0, 2 

c

Start control

Level

Level

Level

Edge

Edge

Edge

Level

Protections Menu

Phase imbalance fault

Enabled

Enabled 

d

Enabled 

d

Enabled 

d

Enabled 

d

Enabled 

d

Enabled 

d

Phase sequence

ABC

ABC

ABC

ABC

ABC

ABC

ABC

Motor rated voltage

480

Rated system  

voltage

Rated system  

voltage

Rated system  

voltage

Rated system  

voltage

Rated system  

voltage

Rated system  

voltage

Starter must be ordered with pumping software installed.

A value of one (current limit start) may be selected for this application, but longer starting times and constant loads should be observed when starting.

Two second stop time must be set if this is an ammonia compressor application.

Customers operating equipment on either ungrounded systems or high resistance grounded systems may need to adjust the severity and/or duration of imbalance protection.  

These power systems periodically experience phase angle shifts that can be picked up as a false imbalance trip.