Bar Installation Guide

S

164201723 Rev P01

5

Chapter 2

Installation

This section explains:

S

Equipment inspection

S

BladeUPS Bar 60 setup and installation

Inspecting the Equipment

If any equipment has been damaged during shipment, keep the shipping
cartons and packing materials for the carrier or place of purchase and file
a claim for shipping damage. If you discover damage after acceptance,
file a claim for concealed damage.

To file a claim for shipping damage or concealed damage: 1) File with
the carrier within 15 days of receipt of the equipment; 2) Send a copy of
the damage claim within 15 days to your service representative.

NOTE

Check the battery recharge date on the shipping carton label. If the date has expired

and the batteries were never recharged, do not use the UPS. Contact your service
representative.

Setup

The BladeUPS Bar 60 comes with all hardware required for installation in
a standard EIA or JIS rack with square and round mounting holes.

Tools Required

To assemble the components, the following tools may be needed:

S

Torque wrench with the following attachments:

-

Hex socket size 10 mm for M6 hex bolt

-

Hex socket size 8 mm for M5 hex bolt

S

Torque driver with a Pozidriv

®

#2 for Pozidriv M4 screw

S

Large screwdriver or crowbar for lifting the bar in place

S

Pliers for installing cage nuts

Summary of Contents for Powerware BladeUPS Bar

Page 1: ...Powerware BladeUPS Bar Installation Guide...

Page 2: ...be disposed of properly For more information contact your local recycling reuse or hazardous waste center This symbol indicates that you should not discard waste electrical or electronic equipment WE...

Page 3: ...Guide S 164201723 Rev P01 i Table of Contents 1 Introduction 1 Safety Warnings 2 2 Installation 5 Inspecting the Equipment 5 Setup 5 Tools Required 5 Checking the Package Contents 6 Installation 7 3 S...

Page 4: ...TABLE OF CONTENTS EATON Powerware BladeUPS Bar Installation Guide S 164201723 Rev P01 ii...

Page 5: ...interruptible power systems UPSs can be installed in an industry standard rack outfitted with a BladeUPS Bar 60 for interconnecting the cabinets wiring Figure 1 shows an installed BladeUPS Bar 60 The...

Page 6: ...NSTRUCTIES BEWAAR DEZE INSTRUCTIES Deze handleiding bevat belangrijke instructies die u dient te volgen tijdens de installatie en het gebruik van BladeUPS Bar 60 Lees alle instructies voordat u de app...

Page 7: ...stallazione e il funzionamento di BladeUPS Bar 60 Leggere integralmente le istruzioni prima di utilizzare l apparecchiatura e conservare il presente manuale per futuro riferimento VIKTIGE SIKKERHETSIN...

Page 8: ...onamiento del BladeUPS Bar 60 Por favor lea todas las instrucciones antes de poner en funcionamiento el equipo y guarde este manual para referencia en el futuro VIKTIGA S KERHETSF RESKRIFTER SPARA DES...

Page 9: ...quipment 2 Send a copy of the damage claim within 15 days to your service representative NOTE Check the battery recharge date on the shipping carton label If the date has expired and the batteries wer...

Page 10: ...hed mounting brackets S Wireway main housing with 2 attached side brackets 1 attached terminal block housing and 1 attached wireway access cover S Front cover mounting panel S 2 front covers S Ferrite...

Page 11: ...bracket locations in Figure 3 2 Verify that the side brackets are in the most closed position and that the adjustment screws are tightened to prevent the side brackets from moving CAUTION If the side...

Page 12: ...six M6 12 pan head screws and M6 split lock washers to secure the two wireway side brackets to the front of the rack Install the first screws in the fifth hole location from the bottom Torque the scre...

Page 13: ...se bracket installed on the bar for later re installation see Figure 5 Remove and retain the base bracket and hardware 11 Place the bar in the rack as shown in Figure 4 NOTE The bar can rest on the fl...

Page 14: ...olts Install the bolts from the front of the rack See Figure 5 Torque the bolts to 5 1 0 8 Nm 45 7 lb in 13 Reinstall the base bracket removed in Step 10 Install the bolts from the front of the rack S...

Page 15: ...hole below the top bolt position 14 See Figure 6 Torque the bolts to 5 1 0 8 Nm 45 7 lb in 15 Install two M6 12 hex bolts in each of the bar s three mounting brackets securing the length of the bar t...

Page 16: ...Install two M4 8 pan head screws into the tab on the wireway floor securing the base of the bar to the wireway See Figure 7 Torque the screws to 1 7 0 2 Nm 15 2 lb in Rear of Rack Wireway Floor Tab a...

Page 17: ...g to the rack See Figure 8 Torque the bolts to 5 1 0 8 Nm 45 7 lb in 18 Using nine M4 8 pan head screws secure the wireway terminal block housing to the wireway and to the bar See Figure 8 Torque the...

Page 18: ...head screws install the wireway access cover See Figure 9 Torque the screws to 1 7 0 2 Nm 15 2 lb in M4 8 Pan Head Screws 5 places Wireway Access Cover Figure 9 Wireway Access Cover Installation 20 Ve...

Page 19: ...the front of the rack Verify that the bent edge of the panel is at the top See Figure 11 Install the lower bolts and cage nuts into the second holes from the bottom of the rack frame Torque the bolts...

Page 20: ...NSTALLATION EATON Powerware BladeUPS Bar Installation Guide S 164201723 Rev P01 16 22 Snap the two front covers into place as shown in Figure 12 Front Covers 2 pieces Figure 12 Front Cover Installatio...

Page 21: ...s Table 1 BladeUPS Bar 60 Dimensions WxDxH 14 0 11 3 183 8 cm 5 5 4 4 72 4 Depth of Wireway 90 1 cm 35 5 excluding front covers Weight Bar 19 kg 42 lb Wireway enclosure 20 kg 45 lb Total Weight 39 kg...

Page 22: ...SPECIFICATIONS EATON Powerware BladeUPS Bar Installation Guide S 164201723 Rev P01 18...

Page 23: ...al number S Version number if available S Date of failure or problem S Symptoms of failure or problem S Customer return address and contact information If repair is required you will be given a Return...

Page 24: ...SERVICE AND SUPPORT EATON Powerware BladeUPS Bar Installation Guide S 164201723 Rev P01 20...

Page 25: ......

Page 26: ......

Page 27: ......

Page 28: ...164201723P01 164201723 P01...

Reviews: