Installation Checklist
-
All packing materials and restraints have been removed from each cabinet.
-
Each cabinet in the UPS system is placed in its installed location.
-
Shipping brackets are installed on the cabinet and bolted to the floor for permanent installations.
-
All conduits and cables are properly routed to the IAC-D.
-
All power cables are properly sized and terminated.
-
Distribution Panel branch circuit breakers are installed and wired to load. (OPTIONAL)
-
If installed, Distribution Panel Input breaker current settings are correct.
-
If installed, Distribution breaker current settings are correct.
-
A ground conductor is properly installed.
-
Air conditioning equipment is installed and operating correctly.
-
The area around the installed UPS system is clean and dust-free. (The UPS and IAC-D must be installed on
a level floor suitable for computer or electronic equipment.)
-
Adequate workspace exists around the IAC-D and other cabinets.
-
Adequate lighting is provided around all UPS system equipment.
-
A 120V service outlet is located within 25 feet of the UPS and IAC-D equipment.
-
Startup and operational checks are performed by an authorized Powerware Customer Service Engineer.