UPS SETUP
Eaton 9355 UPS (10/15 kVA) User's Guide
S
164201594 Rev D
www.eaton.com/powerquality
15
Two-High UPS Cabinets
To remove a two-high UPS from the shipping pallet:
1.
Remove the M10 bolt securing the vertical bracket to the pallet (see
Figure 6).
2.
Remove and retain the three M4 screws securing the vertical
bracket to the UPS. Remove the vertical bracket.
M10 Bolt
M4 Screws
Figure 6. Removing the Vertical Bracket
3.
Reinstall the M4 screws to the UPS (see Figure 7).
M4 Screws
Figure 7. Reinstalling the M4 Screws
Summary of Contents for Powerware 9355
Page 1: ...Powerware Series Eaton 9355 UPS 10 15 kVA User s Guide...
Page 2: ......
Page 3: ...Powerware Series Eaton 9355 UPS 10 15 kVA User s Guide...
Page 119: ......
Page 120: ...164201594D 164201594 D...