Installation of PRLSEB type barrier kits 

  

  

eaton 

www.eaton.com

Step 3. 

Installing the front barriers - (if applicable)

A.  PD3

1.  Line up the barrier's circular features with the terminal 

holes on the breaker.

2.  Press the barrier into place.

Figure 3. Installing the PD3 front barrier.

  

Step 4. 

Completing the installation

A. 

Fasten the large wire tie that was previously pre-installed at 

the top of the boot.

B. 

Install and fasten the small wire ties along the front of the 

boot to close it.

C. 

Cut off the excess wire tie material.

Figure 4. Installation of the boot - PD2 frames.

 

   

boot - PD3 frames.

Figure 5. Installation of the 

Figure 6. Installation of the 

Figure 7. Installation of the

boot - PD4 frames.

boot - PD5 frames.