IL012287EN

Installation of PRLSEB type barrier kits 

  

  

eaton 

www.eaton.com

St

Part B

ep 2. 

Installing the boots

Perform the following steps for each rubber boot, starting with the 

center pole of the breaker.

A.  Ensure the cables are maintained straight as far as possible from 

the breaker.  Install a cable tie around the conductors if multiple 

conductors are to be inside the boot. 

Figure 2. Installation of the PD2, PD3, PD4 & PD5 boots.

B.  Install the large wire tie onto the end/top of the rubber boot 

without fastening it.  Note that the opening for the wire tie on 

the rear of the boot will not be visible once the boot is installed.

C.  Slide the rubber boot sub-assembly under and over the conduc-

tors.  The opening should face the front of the panel.

D.  Slide the boot towards the housing and align the bottom of the 

boot with the housing.

E.  Install the boot frame into the housing by pressing into place.  

Ensure the boot is secured onto the four tabs in the housing.

PD3 Frame

PD4 Frame

PD5 Frame

PD2 Frame

Part A

Part A

Part B (x3)

Part B (x3)

Part B (x3)

Part B

Part A

Part A