14
Eaton PDI JCOMM Enclosure Installation and Operation Manual P-164001107—Rev 01
a.
Connect
Voltage Source 2 ABCN
, from a panelboard circuit breaker or main feed to the Source 2
terminal blocks, ABCN.
b.
Connect
Voltage Source 2 G
to shared terminal block G.
Figure 5. JCOMM Power Panel
44..44
C
Coonnnneecctt M
Maaiinn oorr S
Suubbddiissttrriibbuuttiioonn C
CTTss
To measure current on main or subdistribution feeds, install split-core CTs rated at 250A on the wires (ABCNG)
and connect to matching cable harnesses.
Different combinations of circuit phases can be monitored: ABCNG, ABC, N only, or G only. Specify in software
setup which large circuit wires are monitored.
Power must be disconnected and locked out before installing and connecting CTs.
Parts used in this step (for each main or subdistribution feed):
Summary of Contents for PDI JCOMM
Page 1: ...p n P 164001107 Revision 01 Installation and Operation Manual Eaton PDI JCOMM Enclosure...
Page 4: ......
Page 12: ...2 Eaton PDI JCOMM Enclosure Installation and Operation Manual P 164001107 Rev 01 Safety...
Page 44: ...34 Eaton PDI JCOMM Enclosure Installation and Operation Manual P 164001107 Rev 01 Operation...
Page 46: ...36 Eaton PDI JCOMM Enclosure Installation and Operation Manual P 164001107 Rev 01 Service...
Page 48: ...38 Eaton PDI JCOMM Enclosure Installation and Operation Manual P 164001107 Rev 01 Bibliography...
Page 50: ...P 16400110701 P 164001107 01...