03/11 IL01203009Z
Installation
7
Safety switch
6
Installation
6.1 Mains Connection
X
Fit the end covering sleeves gas-tight and using a suitable tool.
X
Be especially careful when connecting the cable.
X
The conductor insulation must reach to the terminal.
X
The conductor itself must not be damaged when removing the insulation.
X
Select the cables and the mode of running them in a way that the maximum permitted
cable temperature is not exceeded.
X
Always connect the earth lead.
X
Observe the tightening torque of the terminals
6.2 Back-Up Fuse
X
Provide suitable back-up fuses, see chapter "Technical Data".
6.3 Back-Up Fuses for Auxiliary Circuits
X
Provide suitable back-up fuses, see chapter "Technical Data".
7
Commissioning
Before commissioning
X
Check the cables and lines are clamped properly.
X
Inspect cable glands for damage.
X
Control torques.
X
Ensure that the connection is correctly made.
X
Ensure that unused cable entries are sealed with plugs certified to Directive 94/9/EC.
X
Ensure that unused holes are sealed by stopping plugs certified to Directive 94/9/EC.
X
Ensure that all screws and nuts are fully tightened.
X
Ensure that it contains no foreign bodies.
WARNING
Incorrectly installed components!
Z
Explosion protection cannot be guaranteed any more if the components
are incorrectly installed.
X
Carry out the installation in strict accordance with the instructions and
national safety and accident prevention regulations
(e.g. IEC/EN 61241-14).
Summary of Contents for P1-32/IGF1/SVD-SW/HI11/ATEX22
Page 2: ......
Page 116: ...2 03 11 IL01203009Z 1 1 1 1 2 X X X X IEC EN 61241 14 X X Z X Z X...
Page 156: ...2 03 11 IL01203009Z 1 1 1 1 2 X X X X IEC EN 61241 14 X X Z X Z X...
Page 171: ......
Page 172: ...03 11 IL01203009Z...