background image

8

Instruction Booklet 

IB157001EN

Effective May 2015

Fixed capacitor banks (Unipump, Unipak, and Unipak 

detuned filter) low voltage (600 V and below), NEMA 1 

NEMA 3R (outdoor) enclosed versions 

EATON

 www.eaton.com

Table 7.  Rated current values in amperes

kVAR

240 Vac

480 Vac

600 Vac

1

2.4

1.5

3.6

1.8

2

4.8

2.4

2.5

6

3

3

7.2

3.6

4

9.6

4.8

5

12

6

4.9

6

14.4

7.2

7.5

18

9

7.4

8

19.2

9.6

 —

9

10.8

10

24

12

9.8

12.5

30

15

12

15

36

18

15

17.5

42

21

17

20

48

24

20

22.5

54

27

22

25

60

30

25

27.5

33

27

30

72

36

29

32.5

78

39

32

35

84

42

34

37.5

90

45

37

40

96

48

39

42.5

102

51

42

45

108

54

44

50

120

60

49

55

66

54

60

144

72

59

65

78

64

70

168

84

69

75

180

90

74

80

192

96

78

85

102

83

90

216

108

88

100

240

120

98

120

288

144

118

125

150

123

140

336

168

137

150

360

180

147

160

384

192

157

180

432

216

176

200

480

240

196

225

270

221

250

300

245

300

360

294

350

420

343

400

480

392

Operating features

During normal operation, cleared fuse indicator lamps will 

not illuminate. When a fuse clears on an energized unit, the 

associated lamp will glow.

Unipak detuned filters are equipped with a self-resetting reactor 

over-temperature indicator lamp . Thermal overload indicating light 

activates when reactor temperature reaches 180 °C .

Reactor cabinet thermal overload and cleared fuse indicator lamps

Maintenance 

The following maintenance items require the capacitor to 

be energized and should be performed only by trained and 

qualified personnel .

m

 WARNING

ONLY QUALIFIED ELECTRICIANS SHOULD HANDLE THE INSTALLATION AND 

MAINTENANCE OF THIS CAPACITOR BANK; OTHERWISE, ELECTRIC SHOCK, 

ARC FLASH, OR FIRE MAY OCCUR.

Retorque

Before handling the capacitor, disconnect all and any electrical 

power supply from the circuit into which the capacitor bank is being 

installed . Extreme caution must be taken to prevent accidental 

contact with the terminals of the capacitor during installation, 

operation, and service of this equipment . Accidental contact with 

the capacitor, if not properly discharged, can result in personal injury 

or death .
After five minutes of removing all power from the capacitor bank, 

the capacitors inside the enclosure can be accessed by shorting all 

terminals and then grounding the leads using an insulated shorting 

jumper wire . Using a DC voltmeter, confirm that the capacitor has 

entirely discharged as evidenced by zero voltage present between 

the capacitor terminals prior to performing installation, operation, 

or service of the capacitor bank . Accidental contact with energized 

parts may cause personal injury or death .
Generally, power factor capacitor banks are considered to be 

maintenance free . Over time, the capacitance value may decrease, 

especially when self-healing occurs .

Summary of Contents for NEMA 1

Page 1: ...recautions 2 Catalog numbering systems 2 Receiving 3 Installation 3 Preparation for installation 3 Installation locations 3 Installation procedures 3 Post installation evaluation 4 Installation instructions for Unipak detuned filter 4 Electrical connections 7 Startup and commissioning 7 Alternate system voltage and frequencies 7 Operating features 8 Maintenance 8 Retorque 8 Troubleshooting 9 Gener...

Page 2: ...al energy indefinitely unless properly discharged Each capacitor is fitted with a discharge resistor designed to reduce the residual voltage in the capacitor to 50 V or less after a minute Follow all caution and warning nameplates before attempting to install operate or service the capacitor bank Before handling the capacitor disconnect all and any electrical power supply from the circuit into whi...

Page 3: ... ends Inspect the discharge resistors for any marks of damage or cracks and that they are seated and intact in the terminal If any signs of loose or cracked discharge resistor is noticed stop and do not proceed with the installation and immediately notify your nearest Eaton sales person for further instructions Mechanically secure the capacitor bank to either the wall or the floor using anchor fas...

Page 4: ...propylene with pressure interrupter Number of enclosures 2 2 a Units are designed for 60 Hz operation Consult factory for other frequencies Mechanical installation instructions for Unipak filter Reactor enclosure shall be positioned and mechanically secured next to the capacitor enclosure with a minimum 9 inch separation minimum 12 inch separation preferred between the two enclosures to allow for ...

Page 5: ... 14 2 0 2 14 30 2 14 2 14 55 2 14 2 14 32 5 14 2 0 2 14 32 5 2 14 2 14 60 2 14 2 14 35 14 2 0 2 14 35 2 14 2 14 65 14 2 0 2 14 37 5 6 250 kcmil 2 14 37 5 2 14 2 14 70 14 2 0 2 14 40 6 250 kcmil 2 14 40 2 14 2 14 75 14 2 0 2 14 42 5 6 250 kcmil 2 14 42 5 2 14 2 14 80 14 2 0 2 14 45 6 250 kcmil 2 14 45 2 14 2 14 85 14 2 0 2 14 50 6 250 kcmil 2 14 50 2 14 2 14 90 14 2 0 2 14 60 6 250 kcmil 2 14 55 14...

Page 6: ...Reactor enclosure F c F c Three phase reactor Customer interconnect terminals provided with Unipak detuned filter Ground terminal Ground terminal Bonding conductor Connection conductors and conduit provided by customer Same size as incoming conductors Customer termination terminals provided Reactor thermal switches embedded in windings normally closed Note 6 inch minimum clearance on reactor top a...

Page 7: ...ay be required to determine if the leading power factor and associated voltage rise during light load conditions are acceptable When capacitors are connected to the bus feeder motor control center or switchboard a disconnect and overcurrent protection must be provided Startup and commissioning Connect power to the capacitor bank energize through upstream switch Using an ammeter measure capacitor c...

Page 8: ...ermal overload and cleared fuse indicator lamps Maintenance The following maintenance items require the capacitor to be energized and should be performed only by trained and qualified personnel m WARNING ONLY QUALIFIED ELECTRICIANS SHOULD HANDLE THE INSTALLATION AND MAINTENANCE OF THIS CAPACITOR BANK OTHERWISE ELECTRIC SHOCK ARC FLASH OR FIRE MAY OCCUR Retorque Before handling the capacitor discon...

Page 9: ...rent in each capacitor phase and verify that it is within 10 of current rating stated on the nameplate Troubleshooting Symptom Problem Solution Cleared fuse indicator lamp lit Cleared fuse Disconnect power supply to the capacitor bank Wait at least five minutes before opening the capacitor bank cover Locate the blown fuse and its associated capacitor cell s Inspect the cells for bulging or other i...

Page 10: ... type fuses with 200 000 A interrupting capacity fuses mounted on stand off bushings solderless connectors for easy hookup of incoming line conductors Fuse indicating lights Red neon cleared fuse indicating lights are protected by transparent weatherproof guard Options Non fused units available selected sizes Heavy duty capacitor cells selected sizes Reactors Unipak detuned filter only Detuning St...

Page 11: ...1 Instruction Booklet IB157001EN Effective May 2015 Fixed capacitor banks Unipump Unipak and Unipak detuned filter low voltage 600 V and below NEMA 1 NEMA 3R outdoor enclosed versions EATON www eaton com ...

Page 12: ...ed trademark All other trademarks are property of their respective owners Fixed capacitor banks Unipump Unipak and Unipak detuned filter low voltage 600 V and below NEMA 1 NEMA 3R outdoor enclosed versions Instruction Booklet IB157001EN Effective May 2015 For technical support and application engineering assistance please contact Eaton s TRC at 1 800 809 2772 option 4 option 2 ...

Reviews: