47
Instruction Booklet
IB156002EN
Effective January 2022
Eaton HCU2/HCUn active harmonic
filter installation manual
EATON
www.eaton.com
Figure 55 . IT/BP switch locations on 200 A and 300 A units
IT/BP switches
3. Pull the plunger out.
The switch is open when the plunger is completely out as shown in the figure below.
Figure 56 . Plunger out/switch is open