15
Installation Guide: EV direct connect and junction box kits
EV DIRECT CONNECT AND JUNCTION BOX KITS
www.eaton.com
EV DIRECT CONNECT AND JUNCTION BOX KITS INSTALLATION
Install the cord management bracket
E
STEP E-1
EV direct connect and junction box kits
The cord management bracket is necessary for
the EV direct connect kit and EV direct c
junction box kit.
If mounting bracket to a drywall surface:
• Locate the center of the stud where you wish to
install the bracket .
Note: Please reference the ADA website for
accessibility requirements.
• Using the cord management bracket
(1)
as a
template, precisely align two holes of the bracket
(right or left side) along the center line of the stud
(2)
and mark each of the four mounting holes .
• Using the marks aligned with the stud, pre-drill a
1/8-inch hole at both of the hole locations to a depth
of 5/8 inches .
• For the other two holes (the ones not aligned with
the stud), drill a clearance hole to the size specified
for an appropriate drywall anchor or toggle bolt .
• Install the two drywall anchors or toggle bolts to the
holes .
• Attach the cord management bracket to the wall
using four #10 x 1-1/2 inch Phillips pan head
screws
(3).
If mounting bracket to a plywood or similar surface:
• Determine where you wish to install the bracket .
• Mark screw hole locations (four locations on 1-inch
centers) .
• Using the marks, pre-drill a 1/8-inch hole at each of
the four hole locations to a depth of 5/8 inches .
• Attach the cord management bracket to the wall
using four #10 x 1-1/2 inch Phillips pan head screws .
Reference:
1.
Cord management bracket
2.
Stud
3.
#10 woodscrew 1-1/2 inches long - x4
Figure 6
2
1
3