![Eaton Green Motion DC 22 Training Download Page 14](http://html1.mh-extra.com/html/eaton/green-motion-dc-22/green-motion-dc-22_training_3694157014.webp)
© 2023 Eaton. All rights reserved.
.
14
Mounting on the wall
•
Make sure the wall can support the weight of the unit,
providing enough load-bearing capacity to withstand
additional stress caused by cable tensioning:
•
The charging station
53 kg
•
The CCS cable
4 kg
•
The CHAdeMO cable
6 kg
•
Note that the appropriate types of plastic plugs and screws
must be selected by a professional installer, based on the
following considerations:
•
The installation site
•
The type of the wall
Summary of Contents for Green Motion DC 22
Page 1: ...2023 Eaton All rights reserved 1 Green Motion DC 22 Installer training...
Page 45: ...2023 Eaton All rights reserved 45 LED indicator NO light a Not powered...
Page 48: ...2023 Eaton All rights reserved 48 LED indicator RED light ON a Error in charging...
Page 59: ...2023 Eaton All rights reserved...
Page 65: ...2023 Eaton All rights reserved...