Types DSII and DSLII Circuit Breakers, when supplied as part 
of a metal-enclosed switchgear assembly, may be shipped 
completely assembled and already installed in their respec-
tive breaker compartments. Receiving and handling of this 
equipment is addressed in an assembly instruction manual 
supplied with the assembled equipment. This instruction 
manual still applies, however, to all other aspects of the 
circuit breakers.

Before beginning to unpack new DSII breakers, read and 
understand these directions. Following the directions will 
ensure that you have caused no damage.

Every effort is made to insure that DSII breakers arrive at 
their destination undamaged and ready for installation. Care 
should be exercised, however, to protect the breakers from 
impact at all times. Do not remove protective packaging until 
the breakers are ready for inspection, testing and/or instal-
lation. Shipping containers should be inspected for obvious 
signs of rough handling and/or external damage incurred dur-
ing the transportation phase. Record any observed damage 
for reporting to the transportation carrier and Eaton, once 
the inspection is completed. All reports and claims should be 
as specific as possible and include shop order and general 
order information.

2-2  Unpacking Circuit Breaker

When ready to inspect and install the DSII breaker, care-
fully open the shipping container and remove any packing 
material and any internally packed documentation. The circuit 
breaker is designed and balanced to be easily lifted from the 
shipping container using the appropriate lifting yoke and an 
overhead or portable lifting device.

 CAUTION

DO NOT ATTEMPT TO LIFT BREAkERS WITH ORDINARY 
CRANE HOOkS, ROPES, CHAINS OR OTHER SUCH DEVICES. FAIL-
URE TO FOLLOW THIS CAUTION COULD RESULT IN DAMAGE TO 
VITAL PARTS SUCH AS ARC CHUTES, BARRIERS AND WIRING.

2-2.1  Storing Circuit Breaker

If it is necessary to store a circuit breaker before installa-
tion, do so in its original shipping container. Keep the circuit 
breaker in a clean dry place. Ensure there is ample air circu-
lation and heat, if necessary, to prevent condensation. It is 
very important that the insulation used in the breaker not be 
exposed to dirt or moisture.

NOTICE

A CIRCUIT BREAkER THAT HAS BEEN STORED FOR ANY LENGTH 
OF TIME SHOULD BE OPERATED A MINIMUM OF FIVE TIMES 
BEFORE IT IS PLACED IN SERVICE.

2-3  Lifting Circuit Breaker

To closely examine, install or just to become more familiar 
with the circuit breaker, carefully lift and place the breaker on 
a solid work surface capable of handling the breaker’s weight 
(Table 2.1) or on the captive drawout extension rails of the 
breaker compartment (Figure 1-4). This is accomplished by 
using the appropriate lifting yoke and lifter. The lifting yoke 
consists of two sheet steel hooks specially shaped to hook 
under the top edges of the large openings on each circuit 
breaker side sheet (Figure 2-1).

Table 2.1  Circuit Breaker and Fuse Truck weights

Type 

Pounds

DSII-308 

150

DSII-508 

195

DSII-608 

200

DSII-516 

195

DSII-616 

200

DSII-620 

200

DSII-632 

300

DSII-840 

400

DSII-850 

400

DSLII-308 

200

DSLII-516 

260

DSLII-620 

275

DSII-FT32 Fuse Truck 

325

DSII-FT40 Fuse Truck 

430

Effective July 2010

 

Instructional Book

 IB694C694-03

11

eaton corporation

 www.eaton.com

Summary of Contents for DSII Series

Page 1: ...Effective July 2010 Supersedes July 1997 IB694C694 02 Instructional Book IB694C694 03 Instructions for Installation Operation and Maintenance of Low Voltage Power Circuit Breakers Types DSII and DSLII...

Page 2: ...DSII Drawout Fuse Trucks and their accessories consult the applicable Instruction Book or other descriptive publications For application information consult Eaton see applicable De scriptive Bulletins...

Page 3: ...y Moving Contact Assembly 17 3 4 2 Primary Stationary Contact Assembly 18 3 5 Interphase Barriers 18 3 6 DE ION Arc Chutes Interrupter Assemblies 20 3 7 Electronic Tripping System 20 3 7 1 Electronic...

Page 4: ...LII Current Limiters 48 4 6 2 Blown Limiter Indicator 48 4 6 3 Fuse Truck 48 4 6 4 Fuse Truck Installation and Use 49 4 6 5 Fuse Replacement 49 4 6 6 Blown Fuse Indicator 49 SECTION 5 INSPECTION AND M...

Page 5: ...ounted 25 3 16 Power Operated DSII Breaker Front Cover Removed 26 3 17 Latch Check Switch Operation 27 3 18 Undervoltage Trip Attachment Operation 27 3 19 Overcurrent Trip Switch Operation 28 3 20 Clo...

Page 6: ...echanism 58 5 8 Left Side of Mechanism Lubrication Points 60 5 9 Right Side of Mechanism Lubrication Points 60 5 10 Shunt Trip Device Lubrication 60 5 11 Spring Release Device Lubrication 60 5 12 Trip...

Page 7: ...ed current limiters The purpose of the current limiters is to extend the interrupting rating of the standard DSII breaker Figure 1 3 The Type DSII breaker is a four position drawout Connect Test Disco...

Page 8: ...and the associated hazards should be permitted to work on the equipment Additionally only quali fied personnel should be permitted to install or operate the equipment 2 Always be certain that the pri...

Page 9: ...dance with established safety practices 1 5 OTHER PUBLICATIONS AND DOCUMENTATION In addition to this instruction manual other printed information and documentation is available and supplied as appropr...

Page 10: ...3 Type DSLII Breaker with Integral Current Limiters Figure 1 4 DSII Breaker Shown on Compartment s Captive Extension Rails Effective July 2010 Instructional Book IB694C694 03 10 eaton corporation www...

Page 11: ...ed to be easily lifted from the shipping container using the appropriate lifting yoke and an overhead or portable lifting device CAUTION DO NOT ATTEMPT TO LIFT BREAKERS WITH ORDINARY CRANE HOOKS ROPES...

Page 12: ...SE BARRIERS ASSIST IN MAINTAINING PROPER CLEAR ANCES AND MUST BE IN PLACE AT ALL TIMES DURING CIRCUIT BREAKER OPERATION WITHIN A BREAKER COMPARTMENT Remove the three arc chutes which are mounted on to...

Page 13: ...e levering crank in the direction required to get the levering arms in the REMOVE position Carefully push the circuit breaker into the breaker compartment until it physically stops Begin turning the l...

Page 14: ...ure that it will be isolated or carrying NO current before it can be levered to the DISCONNECT position Dummy elements require the same size compartment as an equivalent Type DSII breaker of the same...

Page 15: ...DSII Circuit Breakers are available with either a manually operated or electrically operated two step stored energy mechanism It provides positive control of the closing instant Six continuous current...

Page 16: ...pping system True RMS sensing is provided for proper correlation with thermal characteristics of conductors and equipment 3 2 Type DSLII Limiter Circuit Breaker Type DSLII Circuit Breakers are coordin...

Page 17: ...AMAGE BODILY INJURY AND OR DEATH 3 3 Basic Breaker Assembly The basic breaker assembly includes a chassis a con trol panel an operating mechanism a tripping system a levering in device drawout breaker...

Page 18: ...the magnetic fields of the currents in each arcing contact finger causes the fingers to be attracted toward each other when closing against fault currents This results in a blow on action on the arcin...

Page 19: ...nsulating Link Adjusting Nut Pivot Block Moving Main Contact Assembly Figure 3 4 Type DSII 308 Pole Unit Assembly Front View Upper Terminal Lower Terminal Sensor Removed Figure 3 5 Type DSII 308 Pole...

Page 20: ...ing the arc In addition to steel plates the larger arc chutes include hard arc resistant glass polyester plates These plates produce turbulence in the exhaust gases above the steel plates and Moving A...

Page 21: ...ion Settings Trip Actuator 600 Ohms Nominal Resistance Typical DSII Type Circuit Breaker Sensors Alternate ground locations may be required to meet installation requirements Figure 3 10 TypicalType DS...

Page 22: ...ate with the load or system refer to the specific trip unit instruction book 3 7 2 Sensors Three current sensors are installed at the rear of the circuit breaker on the lower studs directly behind the...

Page 23: ...hand This is accomplished through the use of a front mounted spring charge handle The spring charge handle used with manually operated circuit breakers is significantly longer than the handle used wi...

Page 24: ...ring release latch Like the manually operated circuit breaker the power operated circuit breaker can also be closed manually by pushing on the front control panel close bar Figure 3 3 Like the manuall...

Page 25: ...e spring release coil is energized through the anti pump relay the motor cut off switch and a normally closed b auxiliary switch contact which operates the spring release latch to release the closing...

Page 26: ...r five normally open and five normally closed contacts are available for use on both manually and power operated breakers 3 10 7 UndervoltageTrip Attachment UVTA The undervoltage trip attachment is op...

Page 27: ...due to phase or ground overcurrent Tripping by the trip plate shunt trip device undervoltage trip device and other such methods does not cause it to operate Pole Shaft Breaker Closed Position Breaker...

Page 28: ...ounter used to provide a record of the number of breaker operations Figure 3 3 The counter is linkage connected to the pole shaft Actuator Cam Normal Position Overcurrent Trip Indication Position Figu...

Page 29: ...ndicate Spring Charged CAUTION DO NOT RELEASETHE CHARGING HANDLE BEFORETHE CHARGING OPERATION IS COMPLETED IFTHE HANDLE IS RELEASED BEFORETHE OPERATION IS COMPLETED THE HANDLE WILL RETURNTO ITS NORMAL...

Page 30: ...s previously detailed in Paragraph 4 1 It is possible to manually recharge the closing springs im mediately after closing the breaker and before it has been tripped open This results in the springs lo...

Page 31: ...Refer to Figure 4 5 The basic elements are mounted on the crank shaft 8 This is a straight shaft with four flats machined on it and a crank arm 11 attached to each end Each crank arm connects to its c...

Page 32: ...Charge Handle Stop Roller Crank Shaft Motor Crank and Handle Spring Release Latch Emergency Charge Device Moving Contact Assembly Spring Release Device Crank Arm Insulating Link Oscillator Pawl Closin...

Page 33: ...Pawl Lifter Trip Shaft Ratchet Bushing Oscillator Pawl Close Cam Ratchet Wheel Oscillator Motor Cut Off Switch Cam Hold Pawl Mechanism Side Frame Right Hand Crank Shaft Oscillator Mechanism Side Frame...

Page 34: ...Spring Spring End Motor Crank Roller Crank Shaft Ratchet Wheel Ratchet Wheel Pin Hold Pawl Figure 4 6 Power Operated Spring Charge Details a Spring Charged Note Main cam position for this crank shaft...

Page 35: ...are released to close the breaker When the breaker closes the b contact opens to cut off the spring release coil SR and motor MOT and the limit switch LS contacts reset If the close contact CS C is m...

Page 36: ...ct Pivot Pin Main Drive Link Main Roller Spring Release Latch Insulating link Adjusting Stud and Lockout Insulating Link Mechanism Side Frame Hardened Latch Surfaces b Breaker Open Spring Charged Spri...

Page 37: ...breaker open The breaker is now ready to be closed Closing is started by counterclockwise rotation of the spring release latch Figure 4 7b This removes the hold on the close cam stop roller and allow...

Page 38: ...Attachment Y Anti Pump Relay UVTA Undervoltage Trip Attachment Optional BOTTOM LEFT ROW When Viewed From Front of Breaker LS Contacts N C Contacts Open When Closing Springs are Fully Charged N O Cont...

Page 39: ...e type of operation it causes some extra shock on the mechanism parts Therefore trip free operations should be avoided The trip shaft can be rotated to trip the breaker in a number of ways 1 Breaker T...

Page 40: ...y or manually 4 The breaker can be withdrawn from the compartment by direct pull The levering device is not engaged with the cradle at this point 5 The levering device arms are in a horizontal positio...

Page 41: ...Shutter Pivot Pin Pole Shaft Levering Device Shaft Trip Shaft Trip Shaft Pin Tripping Tab Trip Plate Trip Plate Hook Levering Device Crank Handle b Shutter Trip Plate Held in Tripped Position Figure...

Page 42: ...being driven in either direction by the levering device or while it is standing in any intermediate position between TEST and CONNECT or DISCONNECT Figure 4 11a shows the shutter and trip plate for no...

Page 43: ...s to its closed position when the levering crank is removed The levering device arms are now almost vertically downward Figure 4 12c shows the DISCONNECT position Here the cam also rotates so as to bl...

Page 44: ...ed the interlock plate can be rotated freely on the shaft about 10 degrees This is because the wide slot is considerably wider than the drive pin If the interlock screw is in place in the narrow slot...

Page 45: ...Interlock Screw See Paragraph 4 5 7 Interlock Plate Assembly Pin A Drive Pin Pin B Interlock Screw Close Bar Levering Device Shaft Close Bar Pivot Narrow Slot Close Bar Cam Wide Slot Levering Device...

Page 46: ...e bar is pushed the upper end of the spring release latch link swings free to the right because the indicator pin is not there to stop it Consequently no force is applied to the vertical arm of the be...

Page 47: ...ver behind the notch in the padlock plate With the padlock plate held forward the padlock interlock lever cannot move Consequently the projection from the trip plate is held in the slot in the padlock...

Page 48: ...For this reason there is no fixed mounted version of the DSLII circuit breaker 4 6 2 Blown Limiter Indicator The blown limiter indicator provides a visual indication on the front of the DSLII circuit...

Page 49: ...art ment the fuses can be removed by unbolting them from the conductors on the fuse truck This is a relatively uncom plicated procedure on the DSII FT40 fuse truck because there is sufficient working...

Page 50: ...ped Position Figure 4 17 Blown Limiter Indicator Figure 4 19 DSII FT32 FuseTruck Rear View Figure 4 18 DSII FT32 FuseTruck Front View Figure 4 20 DSII FT32 FuseTruck Front Cover Removed Effective July...

Page 51: ...es a valuable histori cal reference on equipment condition over time 5 2 General Cleaning Recommendations Circuit breaker cleaning activities should be a part of an overall activity that includes the...

Page 52: ...ween the stationary arcing contacts and the center section of the cage If this dimension is not 02 inches or greater the stationary arcing contacts should be replaced NOTICE Be certain that all barrie...

Page 53: ...mensions should be approximately equal If not trip the breaker and adjust the fixed contact system until alignment is obtained Tighten the screws and contacts as described in Paragraph 5 5 2 5 4 5 Arc...

Page 54: ...face is chipped distorted or broken it should be replaced 5 5 Factory Adjustments NOTICE These adjustments are required only when a major overhaul has been performed not during normal maintenance pro...

Page 55: ...ife of the breaker Factory settings adjustments should only be necessary when parts are reassembled after dismantling as described in Paragraphs 5 5 1 and 5 5 2 Maintenance adjustments should be made...

Page 56: ...g screw clockwise until the breaker trips This is the no overlap position 3 Conclude by rotating the adjusting screw four turns in a counterclockwise direction 5 5 2 Breaker Open Position Stop Adjustm...

Page 57: ...ce Main Drive Link Shunt Trip Armature Trip Shaft Adjusting Screw Shunt Trip Coil Trip Actuator Figure 5 5 ShuntTrip Details ShowingTrip Shaft Adjustment Anti Rebound Latch Open Position Stop adjustab...

Page 58: ...he exact position with respect to the worm gear position for proper interlock operation This is achieved when the threaded worm shaft bottoms in the stop nut and the interlock cam is in the con nected...

Page 59: ...should be operated a minimum of five times before being put in service 5 6 2 Lubricant Location NOTICE All parts of the levering mechanism have sufficient lubrication and should not require any furthe...

Page 60: ...brication Points 4 Figure 5 10 ShuntTrip Device Lubrication 9 2 Figure 5 9 Right Side of Mechanism Lubrication Points 6 Figure 5 11 Spring Release Device Lubrication Effective July 2010 Instructional...

Page 61: ...7 7 Figure 5 12 Trip Shaft Lubrication Effective July 2010 Instructional Book IB694C694 03 61 eaton corporation www eaton com...

Page 62: ...d item number as shown in the Renewal Parts Data Book Also include the breaker type shop order number or style number as shown on the nameplate on the front cover of the circuit breaker Some of the de...

Page 63: ...Effective July 2010 Instructional Book IB694C694 03 63 eaton corporation www eaton com...

Page 64: ...ies or other contractual agreement between Eaton and the purchaser THERE ARE NO UNDERSTANDINGS AGREEMENTS WARRANTIES EXPRESSED OR IMPLIED INCLUDING WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE OR ME...

Reviews: