16
External Battery Cabinets
6. Slowly roll the cabinet toward the front of the pallet. Continue rolling the cabinet down the ramp until the
cabinet is clear of the ramp (see Figure 4-4).
7. Roll the cabinet to the final installation location.
8. If installing the cabinet permanently, retain the shipping brackets and hardware; otherwise, recycle the
pallet, ramp, and shipping brackets in a responsible manner.
9. Secure the EBC in position by lowering the leveling feet until the cabinet is not resting on the casters and
the cabinet is level.
10. If permanently mounting the system, proceed to Step 11;
11. Using the retained hardware, reinstall the shipping brackets removed in Step 2 and Step 5 to the front and
rear of the EBC with the angle facing outward (see Figure 4-1 and Figure 4-3).
12. Secure the cabinet to the floor with customer-supplied hardware.
figure 4-1 . removing the front Shipping Bracket
figure 4-2 . Attaching the ramp to the Pallet
figure 4-3 . removing the rear Shipping Bracket
figure 4-4 . rolling the Cabinet down the ramp
Rear Shipping Bracket
Rear Shipping Bracket
Shipping Bracket Bolts
Shipping Bracket Bolts
Shipping Bracket Bolts
Shipping Bracket Bolts
Front Door
Ramp (side panel from wood container)
EBC
Leveling Feet
Leveling Feet
Pallet
Pallet
Pallet
Summary of Contents for Double EBC
Page 1: ...External Battery Cabinets Installation and Operation Manual Eaton UPS Accessories...
Page 2: ......
Page 29: ...23 External Battery Cabinets Notes...
Page 34: ......
Page 35: ......
Page 36: ...614 01726 01...