Isolating and grounding a cable requiring repair

1.  De-energize cables

A.  Open switches at both ends of cable to be isolated. 

Refer to Figure 4.

B.  Determine that there is adequate working room 

around the terminators for parking the grounded 

standoff bushings.

C.  Determine that there is adequate working room for 

handling clampstick around apparatus cabinet.

D.  Place insulating rubber blanket on the ground 

directly in front of terminators.

E.  Inspect and test all operating equipment for 

serviceability.

F.  Connect grounding elbows to system ground.
G.  Connect ground leads of protective caps to system 

ground.

H.  Connect ground leads of grounded standoff 

bushings to system ground.

2.  Determine that cables are de-energized

A.  Remove 200 A protective cap or arrester from 

T-OP II terminators using clampstick and set aside in 

a clean, protected area.

B.  Insert test probe into 200 A interfaces using 

clampstick.

C.  Test for voltage by using voltage detector designed 

for terminators. Remove probe after testing.

3.  Provide a visible ground

A.  Close grounding elbows into T-OP II 200 A interface 

using a clampstick. Refer to Figure 5.

4.  Provide a visible break

A.  Clean and lubricate grounded standoff bushing.
B.  Mount grounded standoff bushing in the apparatus 

parking pocket using a clampstick. Do not tighten 

eyebolt–leave grounded standoff bushing loose in 

parking stand. Refer to Figure 6.

C.  Grasp U-OP operating handle with clampstick, but 

do not pull handle completely into clampstick.

Figure 5. Close grounding elbows.

Figure 6. Mount grounded standoff bushing.

 WARNING 

High Voltage. Do not proceed until cable is de-energized. 

Failure to company may result in death, serious personal 

injury and equipment damage.

 CAUTION 

High Voltage. Ground all three phases (Steps 2 and 

3) before proceeding. Failure to comply may result in 

serouis personal injury and equipment damage.

3

600 A U-OP VISIBLE BREAK CONNECTOR SYSTEM OPERATION INSTRUCTIONS

   MN650022EN   March 2016

Summary of Contents for COOPER POWER SERIES

Page 1: ...600 A U OP visible break connector system operation instructions COOPER POWER SERIES Deadbreak Apparatus Connectors MN650022EN Effective March 2016 Supersedes S600 14 1 June 2010...

Page 2: ...EXISTING CONTRACT BETWEEN THE PARTIES ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF EATON THE CONTENTS OF THIS DOCUMENT SHALL NOT BECOME PART OF OR MODIFY ANY CONTRACT BETWEEN THE PARTIES In no ev...

Page 3: ...1 Handling and storage 1 Standards 1 Description of operation 1 INSTALLATION PROCEDURE Equipment required 2 Isolating and grounding a cable requiring repair 3 Reconnecting the circuit from the cable...

Page 4: ...ty information DANGER Hazardous voltage Contact with hazardous voltage will cause death or severe personal injury Follow all locally approved safety procedures when working around high and low voltage...

Page 5: ...U OP connector and inspect it thoroughly for damage incurred during shipment If damage is discovered file a claim with the carrier immediately Handling and storage Be careful during handling and stor...

Page 6: ...ector 1 Clampstick Figure 4 Open switch at both ends of cable Figure 3 The U OP connector system in a typical pad mounted switchgear application U CONNECTOR APPARATUS BUSHING PARKING STAND 2 BUSHING 6...

Page 7: ...A interfaces using clampstick C Test for voltage by using voltage detector designed for terminators Remove probe after testing 3 Provide a visible ground A Close grounding elbows into T OP II 200 A i...

Page 8: ...k clockwise until the operating shaft is completely seated on the mating stud H Verify that the U connector is completely seated by ensuring that the operating shaft is on far enough to cover the inde...

Page 9: ...g leg over the apparatus bushing the short leg over the exposed deadbreak junction interface and the operating shaft over the mating stud F Rotate the handle clockwise until the operating shaft is com...

Page 10: ...This page intentionally left blank 6 600 A U OP VISIBLE BREAK CONNECTOR SYSTEM OPERATION INSTRUCTIONS MN650022EN March 2016...

Page 11: ...This page intentionally left blank 7 600 A U OP VISIBLE BREAK CONNECTOR SYSTEM OPERATION INSTRUCTIONS MN650022EN March 2016...

Page 12: ...tates Eaton com cooperpowerseries 2016 Eaton All Rights Reserved Printed in USA Publication No MN650022EN Rev 00 Replaces S600141 Rev 00 Eaton is a registered trademark All trademarks are property of...

Reviews: