Installation procedure
Equipment required
•
(3) 200 A Grounding Elbows
•
(3) 600 A Grounded Standoff Bushings with U-OP Studs
•
(3) U-OP/T-OP™ II Protective Caps
•
(1) O & T Tool
•
(1) Voltage Detector
•
(1) Clampstick
Figure 4. Open switch at both ends of cable.
Figure 3. The U-OP connector system in a typical pad-mounted switchgear application.
U CONNECTOR
APPARATUS BUSHING
PARKING STAND
2 BUSHING 600 A
DEADBREAK JUNCTION
T-OP II CONNECTOR
CURRENT PATH THROUGH
U-OP CONNECTOR
SYSTEM ( )
2
600 A U-OP VISIBLE BREAK CONNECTOR SYSTEM OPERATION INSTRUCTIONS
MN650022EN March 2016