Section 5:  Troubleshooting and Maintenance

5.1  Level of Repair

This manual is written with the assumption that only ATS trouble-

shooting will be performed.  If the cause of malfunction is traced 

to an ATC-100, the unit should be replaced with a new unit.  The 

malfunctioning unit should then be returned to Eaton Electrical, 

Inc. for factory repairs.

5.2  ATC-100 Troubleshooting

The Troubleshooting Guide (Table 3) is intended for service per-

sonnel to identify whether a problem being observed is external or 

internal to the unit.  For assistance with this determination, con-

tact Eaton Electrical.  If a problem is identified to be internal, the 

unit should be returned to the factory for replacement.

Table 3. Troubleshooting Guide.

SYMPTOM

PROBABLE CAUSE

POSSIBLE SOLUTION(S)

All front panel LED’s are off.

Control power is deficient or absent.

ATC-100 is malfunctioning.

Verify that control power is connected at J7 and that it is within 

specifications.
Replace the unit.

“Unit Status” LED is not blinking.

Control power is deficient or absent.

ATC-100 is malfunctioning.

Verify that control power is connected at J7 and that it is within 

specifications.
Replace the unit.

Front panel pushbuttons do not work.

Bad connection inside the ATC-100.

Replace the unit.

Utility source or Generator source is not available 

when it should be.

Voltage and/or frequency are not within set-point values.

Verify voltage and/or frequency with multimeter.  Check the pro-

grammed setpoint values.

“Utility Connected” LED is blinking.

Utility switching device did not open when it was commanded to open 

(within 6 seconds).
Utility switching device did not close when it was commanded to close 

(within 6 seconds).
Utility closed contacts did not open when Utility switching device opened 

(within 6 seconds)
Utility closed contacts did not close when Utility switching device closed 

(within 6 seconds).

Check the utility circuit breaker shunt trip (ST) wiring.

Check the utility circuit breaker spring release (SR) wiring.

Check the utility closed control input wiring on J-4, Pins 1 and 2.

Check the utility closed control input wiring on J-4, Pins 1 and 2.

Press Reset pushbutton on rear of unit to reset the fault.

“Generator Connected” LED is blinking.

Generator switching device did not open when it was commanded to open 

(within 6 seconds).
Generator switching device did not close when it was commanded to 

close (within 6 seconds).
Generator closed contacts did not open when Generator switching device 

opened (within 6 seconds).
Generator closed contacts did not close when Generator switching device 

closed (within 6 seconds). 

Check the generator circuit breaker shunt trip (ST) wiring.

Check the generator circuit breaker spring release (SR) wiring.

Check the generator closed control input wiring on J-4, Pins 1 and 3.

Check the generator closed control input wiring on J-4, Pins 1 and 3.

 

Press Reset pushbutton on rear of unit to reset the fault.

“Generator Available” LED is blinking.

Generator source voltage and/or frequency were not within setpoint val-

ues within 90 seconds of trying to execute a System Test, Engine Start, 

or Generator Test.

Verify generator voltage and/or frequency with multimeter.  Check 

the engine maintenance.

Press Reset pushbutton on rear of unit to reset the fault.

Unit will not perform an Engine Start test.

Engine Start pushbutton was not pressed.

Generator source voltage and/or frequency did not become available 

within 90 seconds of engine starting.

Press and hold (for 5 seconds) the Engine Start pushbutton to ini-

tiate the test.
Verify the voltage and/or frequency with a multimeter.  Check the 

engine maintenance.

Unit will not perform a System Test.

System Test pushbuttons were not pressed.

Generator source became unavailable when connected to the load.
Generator source became unavailable before connecting to the load.
Generator source voltage and/or frequency did not become available 

within 90 seconds of engine starting.

Simultaneously press the Engine Start and Set Generator Test push-

buttons to initiate the test.
Check the generator/load sizing.
Check the generator for proper function.
Verify the voltage and/or frequency with a multimeter.  Check the 

engine maintenance.

Generator Test failed to exercise.

Generator source voltage and/or frequency did not become available 

within 90 seconds of engine starting.
Generator source became unavailable when connected to the load.
Generator source became unavailable before connecting to the load.

Verify the voltage and/or frequency with a multimeter.  Check the 

engine maintenance.
Check generator/load sizing.
Check the generator for proper function.

Engine fails to start after the TDES timer times out. Incorrect wiring.

Generator Start relay Normally Open contacts are not closed.
Engine did not start.

Check the wiring between the Generator Start relay (J-5) and the 

engine.
Replace the unit.
Check the generator for proper function.

Summary of Contents for ATC-100

Page 1: ...M Manual for the Eaton ATC 100 Automatic Transfer Switch Controller Instructional Booklet Description Page 1 Introduction 2 2 Hardware Description 5 3 Operation 11 4 Programming 13 5 Troubleshooting...

Page 2: ...the utility power source In Automatic Transfer Switch ATS equipment the switch s intel ligence system initiates the transfer when the utility power falls below or rises above a preset voltage or freq...

Page 3: ...ity is defined as failed when it is outside of its undervoltage set point range for the nominal voltage setting Generator Failed or Fails Generator is defined as failed when it is outside of its under...

Page 4: ...wer Source Annunciation This feature provides LED s to indicate switch position and power source availability indications Switch Position Provides LED s to indicate the transfer switch position 12C Ut...

Page 5: ...er will determine if In phase transition is performed In phase transition is attempted for 10 minutes on a 3 phase sys tem If unsuccessful an open transition is performed Time Delay Neutral TDN featur...

Page 6: ...ooklet Page 6 Effective March 2010 O M Manual for the Eaton ATC 100 Automatic Transfer Switch Controller Figure 1 The ATC 100 Front Panel UTILITY CONNECTED UNIT STATUS GENERATOR CONNECTED SET GENERATO...

Page 7: ...is running the test will terminate Set Generator Test Pushbutton The Set Generator Test pushbutton allows the user to test the generator automatically on a periodic every 7 14 or 28 days basis Pressin...

Page 8: ...se B Phase A Generator Phase C Phase B Phase A Generator Utility Utility Generator Control Power Generator K1 Com K1 NO DC_Output Generator Closed K2 Com K2 NO Earth Ground Gen Start Com Gen Start NO...

Page 9: ...Generator Phase C Phase B Phase A Generator Utility Utility Generator Control Power Generator K1 Com K1 NO DC_Output Generator Closed K2 Com K2 NO Earth Ground Gen Start Com Gen Start NO Control Inpu...

Page 10: ...e it indi cates to the ATC 100 that the generator switching device is closed When this input is in the Unconnected state it indicates to the ATC 100 that the generator switching device is open This in...

Page 11: ...gize which closes its Normally Open contacts and opens its Normally Closed contacts When the generator source meets the requirements to be consid ered available the Time Delay Normal to Emergency TDNE...

Page 12: ...n 90 seconds of the ATC 100 providing the generator start command 3 If during the TDNE countdown the generator source goes unavailable more than three times TDNE will restart each time 4 If the genera...

Page 13: ...volts As ordered Jumper selectable Three phase or single phase 1 or 3 As ordered Jumper selectable Utility Undervoltage Dropout 80 of Nominal Voltage 80 of Nominal Voltage Fixed setting Generator Und...

Page 14: ...n when it was commanded to open within 6 seconds Generator switching device did not close when it was commanded to close within 6 seconds Generator closed contacts did not open when Generator switchin...

Page 15: ...the plug type connec tors Step 5 Remove the four 4 mounting screws located on the four corners that hold the unit and trim plate against the door or panel These are accessed from the front of the unit...

Page 16: ...System Test Generator Test TDES timer times out Send generator start signal Energize Gen Start relay TDNE timer times out Open Utility breaker Momentarily energize K2 Y Generator is powering the load...

Page 17: ...times out Send Engine Start signal Energize Gen Start relay Is Generator Available TDNE timer times out Sync timer times out Open Utility Switching Device and Close Generator Switching Device Momentar...

Page 18: ...No Yes Sync timer times out Open Generator Switching Device Momentarily energize K1 Sources synchronized before Sync timer times out No Yes and Close Utility Switching Device Utility is powering the l...

Page 19: ...IB01602019E For more information visit www eaton com Instructional Booklet Effective March 2010 Page 19 O M Manual for the Eaton ATC 100 Automatic Transfer Switch Controller Notes...

Page 20: ...RE MADE REGARDING THE INFORMATION RECOMMENDATIONS AND DESCRIPTIONS CONTAINED HEREIN In no event will Eaton be responsible to the purchaser or user in contract in tort including negligence strict liabi...