35
MOBs
without
Wiring
UPS Control
Parallel
S
PAIR
D
ISTE
TW
23
24
19
17
18
13
11
2
1
7
5
6
1
28
2
2
20
1
2
27
16
4
1
5
1
26
0
1
8
9
25
4
2
3
NS
O
I
CONNECT
CK
O
BL
RMINAL
E
T
ER
M
O
T
S
U
C
ABINET
C
E
I
T
4
B
O
M
3
B
O
M
2
B
O
M
1
B
O
M
M
CO
NC
NO
M
CO
NC
NO
M
CO
NC
NO
M
CO
NC
NO
M
CO
NC
NO
M
CO
NC
NO
M
CO
NC
NO
M
CO
NC
NO
CN4
PULLCHAIN
CN4
PULLCHAIN
CN4
PULLCHAIN
CN4
PULLCHAIN
9
CN
ARM
AL
BUILDING
CN9
ARM
AL
BUILDING
9
CN
ARM
AL
BUILDING
N9
C
ARM
AL
BUILDING
PER
M
U
J
G
RMINATIN
E
T
PER
M
U
J
G
RMINATIN
E
T
E
CABL
5
4
-
J
R
E
CABL
5
4
-
J
R
E
CABL
-45
RJ
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
6
CN
CN3
6
CN
CN3
6
CN
3
CN
6
CN
3
CN
S
U
B
N
A
C
S
U
B
N
A
C
S
U
B
N
A
C
S
U
B
N
A
C
T
U
O
IN
T
U
O
IN
T
U
O
IN
UT
O
IN
4
S
UP
3
S
UP
2
S
UP
S 1
UP
Parallel UPS Control Wiring with MOBs
1A
1C
1B
1B
2A
2C
2B
2B
3B
3B
4B
4B
3A
3C
4A
4C
UPS 1
UPS 1
UPS 2
UPS 2
UPS 3
UPS 3
UPS 4
UPS 4
Outputs from
UPSs
Outputs from
UPSs
Bypass inputs
to UPSs
REC inputs
to UPSs
Battery
Battery
Battery
Battery
Battery
Battery
Battery
Battery
1
2
Parallel UPS system connections
figure 4-15 Parallel uPS system connections
Eaton 9EHD UPS (20-40 kVA, 380/400/415V) Installation and Operation Manual
Summary of Contents for 9EHD Series
Page 1: ...20 40 kVA 380 400 415V Installation and Operation Manual Eaton 9EHD UPS ...
Page 2: ......
Page 49: ...notes Eaton 9EHD UPS 20 40 kVA 380 400 415V Installation and Operation Manual 41 ...
Page 88: ......
Page 89: ......
Page 90: ...614 00386 00 ...