Assemble hang bolts(4pcs) at the top of the cabinet.
≥
45
o
Warning:
1.Hang bolts should be screw tightened.
2.Must use all the four hand bolts to lift the cabinet.
3.Make sure the load of sling and crane is larger than 2 tons.
4.The angle between the sling and the level must greater than or equal to 45 degrees.
5.These machine is too heavy, make sure the ground is able to withstand.
Figure 4-3. Lift cabinet with four hang bolts, move to the right installation position and put it down
Bracket Bolts in front side, total 4pcs Bracket
Bolts on rear side, total 4pcs
Figure 4-4.Assemble the bracket bolts in front side and rear side, total 8pcs
24
Eaton 9EHD UPS (20-40 kVA, 380/400/415V) Installation and Operation Manual
Summary of Contents for 9EHD Series
Page 1: ...20 40 kVA 380 400 415V Installation and Operation Manual Eaton 9EHD UPS ...
Page 2: ......
Page 49: ...notes Eaton 9EHD UPS 20 40 kVA 380 400 415V Installation and Operation Manual 41 ...
Page 88: ......
Page 89: ......
Page 90: ...614 00386 00 ...