Eaton 53 BTX Quick Start Manual Download Page 2

PAGE 2 

IOM53CART Rev.1  June 2010                                                                   Filtration.Eaton.com  

Cartridge Maintenance

Model 53 BTX Duplex Strainer, Sizes 

3

4

” - 4”

CARTRIDGE MAINTENANCE 

IMPORTANT 

 For 2”, 2

1

2

”, 3” & 4” Strainers, it is advisable to support 

the cartridge assembly by external means (hoist, slings, etc.) 

during cartridge maintenance.  

 

For 

3

4

”, 1”, 1-

1

4

” & 1-

1

2

” Strainers, use 

your own discretion to support the cartridge 

assembly during cartridge maintenance. 

For Tools and Items, refer to Diagram & Parts List, pg. 1 

CARTRIDGE REMOVAL AND INSPECTION 

CAUTION

 

To remove cartridge assembly, first isolate the strainer 

(shut down your pumps, close valves, etc.). Slowly 

open vents, releasing strainer internal pressure and open 

plugs, Item 9

 at bottom of basket wells (or the drain 

valves if installed) to drain the fluid from the strainer.  

1.  Rotate the 

handle, Item 17

, 90 degrees to 

“Inlet”

 on 

cartridge, Item 4.

 

2.  Remove the four (4) 

cap screws, Item 13

 that secure the 

cartridge assembly to the strainer body. 

3.  Remove plastic caps from threaded holes “A” on top of 

cartridge. Thread the 

Extractor Tool 

(provided), into a 

threaded hole in the top of the cartridge. Use a socket or box 

wrench for turning. As the 

Extractor Tool 

turns, the cartridge 

rises from the strainer body. 

4.  As the 

upper seals Item 22 and upper seats Item 23

 clear the 

top of body, remove the upper seals and seats. 

Top ball, Item 24

 cannot be removed with the handle 

positioned over the inlet.  

Do not remove the 

Top Ball

 at this time.

5.   Continue turning 

Extractor Tool

 until the 

lower seals, Item 

22

 

and

 

lower seats, Item 23

 become visible as the cartridge 

assembly continues to rise. 

Lower seals, seats and ball remain in place with 

the handle positioned over the inlet. Do not 

remove any of these components at this time. 

6.  Continue to raise the cartridge assembly until it has cleared 

the cartridge bore of the body. 

7.  Place the cartridge assembly on a clean surface. With 

cartridge upright & inlet towards assembler, remove 

lower 

seats

 

& lower seals

 at this time. 

8.   Slowly rotate the 

handle, Item 17

, 90 degrees counter 

clockwise until the handle makes contact with 

stem retainer, 

Item 11. Pay special attention to both balls as they may 

shift and dislodge from the cartridge at this time. 

9.   Remove the 

lower and upper balls, Item 24. 

10.  Remove the 

handle screw, Item 18

 (and washer if provided) 

and then remove 

handle, Item 17

. Remove the two (2)

 

screws, Items 12 & 14

 that hold down the 

stem retainer, 

Item 11.

 Remove the 

stem retainer, Item 11 and stem 

retainer washer, Item 19. 

11.  Reattach 

handle, Item 17

 to 

top stem, Item 25

 with 

handle 

screw, Item 18

 and washer if provided. Pull 

top stem, Item 

25 

out from top of cartridge. Next remove

 middle stem, Item 

26

 by pushing downward through cartridge central hole. 

12.  Inspect the two (2) 

cartridge O-rings, Item 21,

 the four (4) 

top 

and middle stem O-rings, Item 20

 and replace. Inspect 

top 

and bottom balls, Item 24

 for scoring. Replace as necessary. 

IMPORTANT  

Keep used seats separate from new  

seats to prevent reinstalling used seats by mistake

CARTRIDGE REASSEMBLY

Note: Make sure that all parts are free from dirt.

IMPORTANT 

All O-rings and mating surfaces require lubrication.  

Use a light film of Process Compatible lubricant.

13.  Lubricate 

middle stem O-rings, Item 20

 and inside of the 

cartridge middle stem bore.

14.  Insert 

middle stem, Item 26

 from bottom of cartridge into the 

cartridge middle stem bore (chamfer provided).

Reviews: