ICUS CONDENSING UNIT INSTALLATION MANUAL 

 

 

Jan 09:F\Qualitair Eng\Icu\Manuals\0412118S

 

 

 

 

 

 

 

 

 

1. INSTALLATION & SAFETY 

 

1.1

 

Installation 

 

The  units  making  up  the  Air  Conditioning  System  must  only  be  installed  by  a  qualified  engineer, 

following the mandatory and local codes of practice. 

 

1.2 

Handling 

 

Care must  be  taken  when  the units  are  moved  or  lifted to ensure that  everyone  and everything  is 
safe. When lifting equipment is used, it must be suitable and approved. 

 

1.3

 

Application 

 

Ensure that the unit is only used for suitable purpose/application. 

 

1.4 

Electrical connection 

 

Electrical  work  and  connections  must  only  be  made  by  authorised  electricians,  in  accordance  with 

mandatory regulations and local codes of practice. 

 

1.5 

Warranty 

 

Failure to comply with the manufacturer’s installation instructions could affect the performance of the 

unit  and  invalidate  the  warranty.    Warranty  is  also  subject  to  the  implementation  of  a  planned 

service/maintenance agreement as documented in the warranty booklet supplied with the unit. 

 

1.6 

Safety Procedure 

 

General 

 

1.

 

All  works  must  be  carried  out  in  accordance  with  the  manufacturer’s  installation  and  operating 

procedures. 

2.

 

Good working practices must be followed at all times so that Mechanical and Electrical hazards are 

kept to a minimum. 

3.

 

The equipment has been fitted with doors and covers to prevent access during operation. These 

must be kept in place and additional guards fitted, if necessary. 

4.

 

The equipment must be connected to an external electrical isolator if one is not supplied fitted to 

the unit. 

5.

 

Servicing and maintenance must only be carried out by fully qualified and competent staff.  Before 

any work is started, electrically isolate the units to make sure that they cannot be switched on 

accidentally and allow sufficient time for isolated parts to come to rest before removing panels.  

Electrical  isolation  switches  must  be  labelled  to  show  that  they  are  OFF  during  servicing  and 

maintenance operations. 

Note: 

Some  units  are  dormant  in  standby  mode  and  can  restart  without  warning  if  they  are  not 

electrically isolated. 

6.

 

Care must be taken not to touch components or pipework which may be extremely hot or cold, for 

a period after the unit is electrically isolated. 

7.

 

After  completing  any  tasks  ensure  all  guards,  covers  and  doors  are  correctly  refitted  before 

restoring the power supply to the unit. 

8.

 

Air  conditioning  equipment  may  generate  unacceptable  noise  levels.  If  noise  levels  are 

unacceptable sound and vibration attenuators may be required.  For noise level guidance refer to 

technical literature, or contact the supplier for advice. 

 

SPECIAL NOTE 

IF ANYTHING IS NOT CLEAR, PLEASE CONTACT YOUR LOCAL SUPPLIER FOR CLARIFICATION. 

 

 

 

 

Summary of Contents for ICUS30

Page 1: ...INSTALLATION MANUAL ICUS CONDENSING UNIT IF SUPPLIED AS A SYSTEM ICC QLC PLEASE REFER TO INDOOR UNIT INSTALLATION MANUAL Eaton Williams Ltd Oldfields Business Park Birrell Street Fenton ST4 3ES Tel 4...

Page 2: ...ce Connection 5 3 4 Air Entry 5 4 Outdoor Unit Access 6 4 1 Access Details Fixings 6 5 General Service Connection 7 6 Power Control Connections 8 6 1 Wiring up the unit 9 6 2 Wiring Requirements 9 6 3...

Page 3: ...hazards are kept to a minimum 3 The equipment has been fitted with doors and covers to prevent access during operation These must be kept in place and additional guards fitted if necessary 4 The equip...

Page 4: ...S Wall Bracket Option Kit The unit is supplied complete with axial fan and guard hermetic compressor shut off service valves fan speed controller low pressure switch high pressure switch winter start...

Page 5: ...ided in the base of the unit to secure the unit to a suitable plinth or to the wall mount bracket kit If required the contractor should install the unit on anti vibration pads 3 3 Service Connections...

Page 6: ...anel 5 Removable top panel Front and side access screw fixings 6 Service access panel Front access screw fixings 7 Reversing valve Heat pump unit only HP LP cut outs Remove service access panel 8 Elec...

Page 7: ...up charge m 5m 25g 25g 40g 40g Refrigerant Connection Sizes Refer to Section 8 for Extended Pipework ICUS30 ICUS40 ICUS55 ICUS80 Liquid 7 1 1 4 1 4 3 8 3 8 Suction 7 2 5 8 5 8 5 8 3 4 Mains Power Cabl...

Page 8: ...8 6 POWER CONTROL CONNECTIONS ICUS SINGLE PHASE COOLING ONLY ICUS Terminal Customer Connections PE Customer Earth Connection E N Customer Neutral Connection L Customer Live Connection C Cooling Signal...

Page 9: ...ing Wiring Power and signal cables run between outdoor and indoor unit Details of the fuse ratings and cable requirements are given in the tables in Section 5 Page 7 of this manual 6 3 Terminations De...

Page 10: ...refrigerant lines are adequately supported using refrigerant pipe clips 7 3 Unit Connections The ICUS unit connections are terminated in male flare connections as detailed in the tables in Section 5...

Page 11: ...itional Charge ICUS30 Suction 3 8 5 8 Suction 3 8 5 None 5m 25g m Liquid Liquid ICUS40 Suction 5 8 5 8 5 8 Suction 8 None 5m 25g m Liquid Liquid ICUS55 Suction 5 8 5 8 5 8 5 8 Suction 10 None 5m 40g m...

Page 12: ...Manuals 0412118S 12 Fitting Pipe Size 3 8 5 8 45 Bend 0 12 0 15 0 18 0 21 90 Bend Short Radius 0 37 0 43 0 49 0 55 90 Bend Long Radius 0 24 0 27 0 30 0 37 180 Bend Short Radius 0 73 0 91 1 10 1 28 18...

Page 13: ...d 3 System Isolation After achieving the specified system vacuum close the gauge low pressure port 5 and switch off the vacuum pump Leave the system for 1 hour and check that the vacuum is maintained...

Page 14: ...icular protection of lungs eyes and skin from refrigerants dust etc Only approved lifting gear and power tools should be used and access to the work area be restricted to authorised personnel Disconne...

Page 15: ...Has correct HRC external fusing isolating been installed 5 Has additional extended pipe run refrigerant charge been measured into the system where necessary or heat pumps been charged correctly 6 Is...

Page 16: ...e diagrams themselves are supplied with the unit and are located in the electrical section Please ensure the correct issue drawing is used with the relevant system refer to supplier if necessary Unit...

Page 17: ...Machinery Directive If alterations are made to this equipment without our approval this declaration becomes invalid Furthermore this equipment may be assembled into other systems which may also const...

Page 18: ...Eng Icu Manuals 0412118S 18 OLDFIELDS BUSINESS PARK BIRRELL STREET FENTON ST4 3ES TEL 01782 597124 FAX 01782 316633 AN EATON WILLIAMS COMPANY As part of the policy of continuous product improvement w...

Reviews: