background image

a

WARNING!

•  Bus wires must not touch or cross while inserting 

into power termination/end seal.

•  Only power terminations/end seals specifically 

approved for the vendor’s style and type of 

heater cable must be used.

15.  Insert bus wires into power termination.

16.  Squeeze power termination ferrule open 

and fill opening with silicone.  (The sili-

cone will set up in about 30minutes with 

a complete cure after 24 hours.)

17.  Push power termination to overlap jacket.

18.  Trime bus wires to exposure length 

shown.

apply silicone 
here

0.5" (13mm)

END SEAL

1.  Remove 0.5" of overjacket exposing the 

braid, then remove the 0.5" (13mm) of 

exposed braid.

2.  Make a 0.4" (10mm) cut at the end of the 

heater cable.

3.  Squeeze end seal and fill with silicone.  

(The silicone will set up in about 30 min-

TSRP POWER CONNECTION KIT

 Installation Instructions    

utes with a complete cure after 24 hours.)

4.  Push end seal over the heater cable.

Apply silicone here

Reviews: