5
Fixing the Cubicle
Step 1- Post Setup
Refer to Appendix A and Appendix B at the back of your manual for full positioning guidelines for the
Single and Double post cubicles.
EASYFIX
™
recommends a cubicle bed slope of 3-4%
Step 1.1 - Set in Concrete
Single Bed
Step 1.2 - Bolt to Floor
Single Bed
Parts List
Item ID
Part Name
Qty.
1
Post
1
A
M12 Through Bolt
4
M12 Through Bolt Pilot Hole:
Ø12mmx100mm deep
1
260
m
m