Step 4
Slide the top pipes on to the top stems of the
posts .
Slide the bottom pipes on to the bottoms stems
of the posts .
PARTS LIST
ITEM ID
PART NAME
2
3
Top Pipe
Bottom Pipe
Drop in an M8 x 90mm Bolt on the top
and bottom pipe/stem to maintain correct
pipe positioning.
Slide a coupling along each of the top
pipes .
Assembly Instructions
Step 2
Step 3
Ensure the predrilled holes in all of the paired
components line up.
For the Dream and Siesta models, ensure that
the pipes are in the correct orientation.
PARTS LIST
ITEM ID
PART NAME
E
M8 x 90mm Bolt
Ensure the coupling is put on in the correct
orientation, as seen in Figure 1.
PARTS LIST
ITEM ID
PART NAME
4
Coupling
Figure 1
2
1
3
1
2
1
3
4
2
4
6